Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM07157
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/08/2021 | JVINCEN1 | FIRE | REVIEW | Approved | |
| 09/14/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1 (Code Review); Sheet A3 (Floor Plan): Please coordinate the Occupant Load listed in the Code Review (98 total) to the Occupant Load listed on the Floor Plan (Dining indicates 87 + 26 = 113 total in the Dining areas, with no indication of Occupant Loads in other areas). 2. Sheet A3; Floor Plan: Per the IBC Section 1108.2.9.1, 5% of dining surfaces for seating and standing spaces shall be accessible and distributed throughout the facility (as listed on Sheet A1 under the Code Review). Please indicate those spaces on the Floor Plan, and indicate the table height at those locations per the ICC/ANSI Section 902.4, and indicate the clear floor space required for maneuvering per the ICC/ANSI Section 902.2. 3. Sheet A3; Section 1: Section 1 indicates a 42" surface height at the new bar. Per the IBC Section 1108.2.9.1, 5% of dining surfaces for seating and standing spaces shall be accessible and distributed throughout the facility. Please indicate the required accessible space at the bar, indicate the counter height at that location, and indicate the clear floor space required for maneuvering per the ICC/ANSI Section 902.2. Revise Section 1 as required. 4. General: Please provide written responses to all review comments. |
| 09/15/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 09/15/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The developed length of the hot water supply piping appears to be greater than fifty feet; provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2018 and C404.5, IECC 2018. |
| 09/15/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 09/21/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 09/21/2021 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
| 09/21/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 09/29/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved |