Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T21CM07066
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/09/2021 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM07066 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Provide Structural Calculations for Foundations, Columns and Roof Framing for the Canopies 1 and 2 per Section 1601.1 of International Building Code 2018. 2. Provide Wind Load Calculations for the Canopies 1 and 2 per Section 1609 of International Building Code 2018. 3. Provide Seismic Calculations for the Canopies 1 and 2 per Section 1613 of International Building Code 2018. 4. All Calculations shall be sealed and signed by Professional Engineer registered with State of Arizona per Section 107.1 of International Building Code 2018. 5. Verify the conflict between Building and Canopies Drawings regarding North marked on the Structural Floor Plans. 6. The requirements in OSHA 1926.757 for the erection of open web steel joists are to be followed. Where steel joists are used with columns that are not framed in at least two directions with solid web structural steel members, a steel joist shall be field-bolted at the column to provide lateral stability to the column during erection. Where constructability does not allow a steel joist to be installed at the column the joists are to be stabilized on both sides of the column. 7. Except for steel joists that have been pre-assembled into panels, connections of individual steel joists to steel structures in bays 40 feet or more shall be fabricated to allow for field bolting during erection. 8. Provide a vertical stabilizer plate at columns for steel joist as required by OSHA 1926.757. 9. Verify OSHA steel erection standards for open web steel joists. Section 1926.757 (a)(8) requires connections of individual steel joists to steel structures in bays of 40 feet or more shall be fabricated to allow for field bolting during erection. 10. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Approved ELECTRICAL REVIEW COMMENTS Denied E-003 DETAILS: Detail 4 and 7 are both Lighting control Relay panels. One shows top feed, the other, bottom feed. Are two details required? E-007 FIXTURE SCHEDULE: Confirm that Lighting relay panel LSD has sufficient lighting contacts. E-110 PARTIAL LIGHTING PLAN: Notes 17&18 are mislabeled 10&11. E-410 ONE LINE DIAGRAM: Panel LW15 could have a higher rated CB. Other similar panels have 225 or 250 amp MCBs. MDP #3 CB LW5 has its trip rating at 70A and may nuisance trip. Suggest a larger trip rating. E-505 PANEL SCHEDULES: Panels LW5 and LW6 show 150A MCB on this sheet, but have 250A MCB on sheet E-411. Coordinate for agreement. PLUMBING REVIEW COMMENTS: Denied 1). Roof Plan Page A1.13 note #423 states "scuppers & overflows as needed confirm in field". Plans will need to illustrate primary & secondary scuppers & downspouts at this time with sizing calculations & loads that derive from IPC 1106.2 thru 1108.3 including primary/secondary scupper detail & downspout detail. -IPC A106.3.1 2). All L-1 & L-2 Lavatories need a TMV-1 mixing valve regardless of what water heater supplies them. -IPC 419.5. Update plan pages TP1.1 & detail #6 on TP4.0 3). Plan page TP1.1 includes Gas notes #5,9,13,15 remove notes or add gas illustrations to plumbing plans. -IPC A106.3.1 4). FB1 Footbath mixing valve shown plan page TP1.1 needs to be a type that conforms to one of the standards from -IPC 423.3 5). Add owner supplied water fountain manufacturer & model number information to TP1.1 -IPC A106.3.1 6). FD1 floor drain shown on plan page TP1.1 shows sure seal trap protection, Plan page TP2.4 note#10 shows water connected trap primer unit. remove the type not being used. -IPC A106.3.1 7). Hot water piping needs 1" insulation -IPC 607.2.1 & 607.5 update plan page TP1.1 8). Plan page TP2.2 shows 4" BLDG drain, Pg. TP4.1 shows 6" BLDG drain, the plan pages need to correlate. _IPC A106.3.1 9). Plan pg. TP2.3 Sanitary branch connection to BLDG drain is illustrating the wrong flow direction. -IPC 706.2 10). Plan Pg. TP2.4 notes #1, #2,#3 list the incorrect backflows for non carbonated beverage equipment. they need to be listed to ASSE 1022 or 1024 rating. -IPC 608.17.1.2 11). Backflows shown on TP2.4 notes #1,2,3 need to have discharge ports piped to an indirect waste receptor. -IPC 608.15.2.1 12). Label cold, hot, & hot return lines on Pg.TP2.4 -IPC A106.3.1 13). Add ST-1 interceptor detail to Pg.TP4.0 -IPC A106.3.1 14). S2 Sink shown Plan page TP4.1 riser is missing the required vent or AAV -IPC 901.2.1 15). Single Lav/toilet restroom near stairs is missing sanitary riser detail on TP4.1 -IPC A106.3.1 |
09/16/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM07066 6251 S Kolb Rd – PAD-26 New Distribution Center (1st Review) TRANSMITTAL: September 16, 2021 This site is located in PAD-26 – Commercial Storage is an allowed use in the PAD. 1. The building plans have been reviewed for compliance with DP21-0192 and although it appears that the plan match unit DP21-0192 has been approved Zoning cannot approve the building plans. 2. Based on the sheet index it appears that development package, DP21-0192, will eventually be included in the building plan set. If included the DP will either need to be the stamped approved set or mark as reference only. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. |
09/16/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
09/16/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
10/19/2021 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | The DP needs to be approved before the building plans can be approved. |
11/01/2021 | JPEELDA1 | FIRE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/01/2021 | NGARCIA3 | OUT TO CUSTOMER | Completed |