Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T21CM07028
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/16/2021 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
09/16/2021 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM07028 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Provide a narrative if any structural components are being removed. Are the partitions being removed all non structural. If structural components are being removed, provide drawings for the replacement of those those structural components along with structural calculations. BUILDING REVIEW COMMENTS: Denied 1. Provide the square footage of area being demolished. 2. Provide the construction type of the existing building along with the existing occupancy types being demolished. Additionally, provide a detailed narrative of the entire scope of work that also includes the future plans of the building. 3. If the building is still being occupied during the demolition phase, ensure all exiting and means of egress remain in place and active. In addition all life safety system must remain in place and in a working manner. MECHANICAL REVIEW COMMENTS: Approved ELECTRICAL REVIEW COMMENTS N/A PLUMBING REVIEW COMMENTS: Approved |
09/16/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | |
09/16/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
09/21/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
09/23/2021 | MGAYOSS1 | DESIGN PROFESSIONAL | REVIEW | Approved | |
09/24/2021 | JVINCEN1 | FIRE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/24/2021 | NGARCIA3 | OUT TO CUSTOMER | Completed |