Permit Number: T21CM07021
Parcel: 13215024A

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T21CM07021
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/01/2021 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T21CM07021

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.

STRUCTURAL REVIEW COMMENTS:
Approved

BUILDING REVIEW COMMENTS:
Denied
1. The referenced floor plan appears to be the existing floor plan, however, notes on the new floor plan do not match the items indicated on the reference floor plan. Provide an accurate existing floor plan along with an accurate proposed floor plan and notate accordingly.
2. Provide an accurate account of affected square footages. Provide the following: 1. The existing square footage of building: 16,555? 2. Provide the exact amount of square footage being improved: 2,000?
3. Provide an accurate occupant load. The plans provide an occupant load based on a expansion but no addition of square footage is being added. It is assumed this occupant load is based on the change of space use. Additionally, the occupant load factor for business is incorrect. The occupant load factor for business is 150 per Table 1004.5.
4. The adopted applicable codes are incorrect and/or missing. Provide an accurate adopted applicable code table.
5. The plans do not indicate if an existing fire alarm or sprinkler system exists. Provide clarification for existing systems.


MECHANICAL REVIEW COMMENTS:
Denied
1. Provide an existing mechanical system schedule with all related information.

ELECTRICAL REVIEW COMMENTS
Approved

PLUMBING REVIEW COMMENTS:
Approved
09/02/2021 JVINCEN1 FIRE REVIEW Reqs Change See bldg comments
09/15/2021 STEVE SHIELDS ZONING REVIEW Approved
09/15/2021 SSHIELD1 ENGINEERING REVIEW Passed
09/15/2021 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
09/21/2021 ROBERT SHERRY WATER REVIEW Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
09/21/2021 NGARCIA3 OUT TO CUSTOMER Completed