Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM06952
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/02/2021 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM06952 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Denied 1. Provide permanent access to equipment located above 16' above grade on roof in an approved manner (IMC2018,306.5) 2. Provide ventilation air to storage room (IMC2018,403.3.1.1) 3. Provide fire dampers at penetrations of exterior wall(IBC2018,705.10) 4. see mark ups on uploaded plan in narratives ELECTRICAL REVIEW COMMENTS Approved PLUMBING REVIEW COMMENTS: Denied 1). Plumbing plan pages need to include a complete Sanitary piping floor plan illustrating how the piping is routed throughout the building, also showing sewer and or building drain connections. -IPC A106.3.1 2). Plumbing Plan pages need to include a complete sanitary isometric riser diagram illustrating fixture drain connection/venting methods, continuation to 2nd floor plumbing, and sanitary vent systems to the termination exit points. - IPC A106.3.1 3). Plumbing plan pages need to illustrate water piping floor plans & water piping isometric riser diagrams. -IPC A106.3.1 4). This occupancy type and load requires 2 male toilets , 2 women toilets. -IPC 403.1 & 403.2 Label restrooms on A21 & P2.0 5). This occupancy type and load requires a High/low Drinking fountain. -IPC 403.1 &410.3 Update Pgs. A21, P1.0, P2.0. 6). Plumbing system requires a water heater, update P1.0, P2.0, & add WH. to the required water piping plan. Also add a water heater detail to the plumbing plans. IPC A106.3.1, IPC 607.1 7). Condensate detail #12 shown on Pg. P3.0, The Condensate drain can not connect to the trap intended for the sink, the condensate would need to indirectly discharge to a separate properly vented trapped waste receptor of its own. -IPC 1002.1 8). Plan Pg. A43 needs to include sidewall to fixture center measurements for the lavs & toilets. -IPC 404.2, 405.3.1 |
| 09/09/2021 | SAMUEL ROGERS | ZONING | REVIEW | Approved | |
| 09/09/2021 | SROGERS2 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 09/09/2021 | SROGERS2 | ENGINEERING | REVIEW | Passed | |
| 09/16/2021 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Show the location of the proposed water meter, backflow preventer, and the water service pipe on a site plan. Provide the size of the water meter serving this building, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1 and 107.2.6, IBC 2018. |
| 09/22/2021 | JPEELDA1 | FIRE | REVIEW | Approved |