Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T21CM06585
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/30/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
09/07/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. General: When applying for a damage repair permit where the repair materials are like-for-like to the damaged materials, the requirements for the permit submittal are as follows: A) A site plan indicating the damaged building location, and specifically locating the damaged areas to be replaced or repaired. B) A short narrative on this drawing indicating a project description and the extent of the repairs. C) A valuation for the project (labor + materials). 2. The site plan provided does not require a registered design professional (architect or engineer) to seal, sign, and date that plan as long as repairs include like-for-like materials. If different construction materials are used, or the existing configuration of materials is changed from the original, then the drawing and documents will require a registered design professional to seal, sign, and date the drawings. |
09/16/2021 | LOREN MAKUS | ENGINEERING | REVIEW | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/17/2021 | VVERA1 | OUT TO CUSTOMER | Completed |