Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T21CM06258
Parcel: 12212010B

Review Status: Completed

Review Details: OTHER

Permit Number - T21CM06258
Review Name: OTHER
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/05/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide plans sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304.
2. A lined water heater with a heat input in excess of 200,000 BTU per hour is considered a boiler and shall be installed in compliance with Section R20-5-404. (Standards for Boilers, Lined Hot Water Heaters and Pressure Vessels) of the Arizona Administrative Code. Reference: Article 4, Section R20-5-401, Arizona Administrative Code. http://apps.azsos.gov/public_services/Title_20/20-05.pdf
3. Plumbing fixtures that receive or discharge liquid waste (e.g. the mop sink) shall be directly connected to the sanitary drainage system. Reference: Section 301.3, IPC 2018.
4. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, vacuum relief or other anti-siphon device, safety pan, and valves. Reference: Sections 503.1, 504, 606.1, and 607.3, IPC 2018.
5. Provide a complete diagram of the natural gas distribution system showing the existing and proposed loads, developed lengths, and the new layout of the distribution piping. Reference: Section 402.2, IFGC 2018.
08/26/2021 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the electrical review comments and provide a written response.!. Provide complete electrical plans to provide for the electrical requirements of the Boiler Unit.
Ref; 2018 IBC 107.2.1, 2017 NEC

Final Status

Task End Date Reviewer's Name Type of Review Description
08/26/2021 NGARCIA3 OUT TO CUSTOMER Completed