Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Permit Number - T21CM06120
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/28/2021 | PCAMARE1 | ENGINEERING | REVIEW | Reqs Change | FROM: Paul Camarena PDSD Engineering Review Section PROJECT: T21CM06120 2011 N CORTE TOMASIN TRANSMITTAL DATE: July 28, 2021 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Engineering Review Section comments were addressed. 01. COMMENT: Engineering has reviewed the plan and cannot approve at this time. Please address the following comments. 02. COMMENT: A grading-only development package is required. Please prepare and submit a DP application through the online permit application process. The grading plan needs to include but not limited to the cut and fill quantities, existing and proposed grades, limits of grading and tops and toes of slopes, pad elevation. 03. COMMENT: Engineering cannot approve the building plan until the Grading Development Package is approved. If you have any questions about this transmittal, Contact Paul Camarena at Paul.Camarena@tucsonaz.gov |
08/12/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM06120 2011 N Corte Tomasin New SFR (1st Review) TRANSMITTAL: August 12, 2021 COMMENTS: the following comments are relative to an application for a Design Development Option (DDO) (UDC 3.11.1). This site is located in the RX-2 zone (UDC 4.7.7). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-1). See Use-Specific Standards 4.9.7.6. The minimum setback is twenty feet facing each interior property line (Table 6.3-1.A). 1. Proposed perimeter yard setback from the propose SFR to the northeast property line is 15’-6 to 16’-3”. DDO is required. 2. The drawing set shall be submitted as a single multi-page PDF File. For your information the DDO Application is a separate submittal from the building plan. Special Applications Section will pull you application and start the process. Your contact at Special Applications is Mark Castro at Mark.Castro@tucsonaz.gov. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov |
08/19/2021 | AWARNER1 | NPPO | REVIEW | Passed | |
08/24/2021 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Reqs Change | T21CM06120 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, please provide an updated complete plan set with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL REQUIREMENTS: Place the site plan on the index as the first page. GENERAL COMMENTS: 1. A dwelling unit providing complete independent living facilities requires compliance with design ordinances for handicap, solar water, photo-voltaic, gray water and EV charging preparations. Design Ordinances adopted by the City of Tucson. 2. Show compliance with the Electric Vehicle Supply Equipment Ordinance adopted by the City of Tucson Ordinance #11844 on 6/22/2021. Include a 40 ampere 240 volt dedicated branch circuit with a NEMA 14-50R receptacle for charging an electric vehicle at a proposed parking space. SITE PLAN: 1. Indicate the location and size of buildings, utility meters and gas, water, electric and sewer or septic lines from property line to building, R106.1.1. Show the gas meter, HCS or septic. PLANS: 1. Show the location of attic vent openings effectively sized for the attic area per R806.2. MECHANICAL PLANS: 1. Provide (an HVAC system with fresh air intake) whole-house mechanical ventilation, or controlled exhaust with a calculated airflow rate, R303.4; N1103.6 & M1505.4. Show the system and appropriate flow rate setting on the plans. A two or three bedroom dwelling of 1501 – 3000 SF requires a 60 CFM continuous setting. ELECTRICAL PLANS: 1. Provide the Electric Vehicle Supply Equipment 40 ampere 240 volt dedicated branch circuit with a NEMA 14-50R receptacle and label the circuit “EV Ready”, N1104.2.1. Include the Electric Vehicle load entry (typically 7680 watts) in the electrical load calculations (continuous demand), N1104.2.2. INTERNATIONAL ENERGY CONSERVATION CODE: 1. Energy Certificate: (Mandatory) place near the indoor furnace, in a utility or laundry room, N1101.14. Add notation to plans. If you have any questions, please contact: Ken Van Karsen (520) 837-4912 City of Tucson Residential Plan Review |