Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/28/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1; Code Review (Plumbing Fixtures): The Code Review indicates "service sink and point-of-use drinking fountain provide". Please indicate on the Floor Plan (Sheet A3) the location of those fixtures. 2. Sheet A3 (Floor Plan); Door Schedule: Please indicate on the Floor Plan the door type for each door listed on the Door Schedule. Provide header and jamb details for each new door. 3. Sheet A3; Floor Plan: The detail indicators at the new partition walls reference 1/A6. Please revise that reference. 4. Sheet A3; Floor Plan: Please indicate the wall type on the plan as indicated in the Wall Legend. 5. Sheet A3; Floor Plan: The new corridor does not meet the requirements of the IBC Section 1020.4 Exception 2. The dead end corridor exceeds the allowable 50' maximum length. Please verify. 6. Sheet A4; Reflected Ceiling Plan: Please provide exit light locations on this plan. Add directional exit lighting as required due to the addition of the new corridor. 7. General: Please provide written responses to all review comments. |
07/29/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Revise the reflected ceiling plan to show the HVAC returns. Verify that the dead-end corridor is not acting as a duct. Reference: Section 601.2, IMC 2018 and Section1020.4, exception 2, IBC 2018. |
07/29/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
07/29/2021 | JVINCEN1 | FIRE | REVIEW | Approved | |
07/29/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
08/04/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
08/12/2021 | SBLOOD1 | ENGINEERING | REVIEW | Passed | |
08/13/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
08/13/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |