Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM05761
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/22/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 07/27/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a site plan that shows the location of the building on the site with the distances from the building to the lot lines drawn in accordance with an accurate boundary line survey. Reference: Section 107.2.6, IBC 2018. 2. Show how the proposed termination of the exhaust fan, EF-1, complies with requirements of Section 506.3.13.3, IMC 2018. 3. Verify that combustible beams supporting the hood comply with Section 507.2.6, IMC 2018 for clearances (i.e. 18-inches). |
| 07/27/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Revise the size of the natural gas pipe serving the 4-Burner Range (15) per Table 402.4 (2). Reference: Section 402.4, IFGC 2018 |
| 07/27/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 07/29/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 07/30/2021 | JVINCEN1 | FIRE | REVIEW | Approved | |
| 08/09/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 08/09/2021 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
| 08/09/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |