Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T21CM05553
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/22/2021 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM05553 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Denied 1. The plans indicate that a sprinkler system is being installed. Is this just the expansion into the new space? Is there an existing alarm system? Ambulatory care facilities. Provide a narrative on the alarm system plans. Ambulatory care facilities require an alarm system however, the presence of a sprinkler system only requires occupant notifications appliances activate upon sprinkler water flow. 2. The boiler room is considered an incidental use. Per table 509, a 1 hour separation is required or a sprinkler system. This is related to comment #1. MECHANICAL REVIEW COMMENTS: Approved ELECTRICAL REVIEW COMMENTS Approved PLUMBING REVIEW COMMENTS: Approved |
| 07/27/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 08/02/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM05553 750 N Alvernon Way – O-3 Building Expansion TRANSMITTAL: August 2, 2021 This site is located in O-3 Zone (UDC 4.7.15), Medical Service Out Patient use is an allowed use in the zone (UDC Table 4.8-3) subject to Use Specific Standard 4.9.13.K. 1. Zoning has reviewed the building plans for compliance with DP21-0180 and although it appears that the building plans match the DP Zoning cannot approve the building plan until the DP is approved. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. |
| 08/02/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 08/04/2021 | JPEELDA1 | FIRE | REVIEW | Reqs Change | GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Denied 1. The plans indicate that a sprinkler system is being installed. Is this just the expansion into the new space? Is there an existing alarm system? Ambulatory care facilities. Provide a narrative on the alarm system plans. Ambulatory care facilities require an alarm system however, the presence of a sprinkler system only requires occupant notifications appliances activate upon sprinkler water flow. 2. The boiler room is considered an incidental use. Per table 509, a 1 hour separation is required or a sprinkler system. This is related to comment #1. |
| 09/02/2021 | SBLOOD1 | ENGINEERING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/02/2021 | VVERA1 | OUT TO CUSTOMER | Completed |