Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW - COMMERCIAL TI
Permit Number - T21CM05144
Review Name: 3RD PARTY REVIEW - COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/04/2022 | STANTEC | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Completed | |
| 04/04/2022 | DBENOIT1 | 3RD PARTY REVIEW-COMMERCIAL | AT 3RD PARTY OFFICE | Completed | |
| 07/13/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 07/19/2021 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
| 07/19/2021 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 07/19/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM05144 2380 E Medina Rd Medical TRANSMITTAL: July 19, 2021 This site is located in the I-1 zone (UDC 4.7.29). Marijuana Dispensary Off-Site Cultivation Location is an allowed use in the zone subject to Use Specific Standards 4.9.9.E.2 and 4.9.13.Q. 1. Clearly demonstrate how the requirements of UDC Article 4.9.9.E.2.k are met. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. |
| 08/18/2021 | JVINCEN1 | FIRE | REVIEW | Reqs Change | -Include (HMIS) hazardous materials inventory statement. Include all chemicals, compressed gases, etc... Product name, component, chemical abstract number, location where stored or used, container sizes, hazard classifications, amount in storage, amount in use-closed systems, amount in use-open systems. -Remove/correct deferred submittal information about ansul system. I'm assuming you meant fire sprinkler system and not ansul system. Page G1.0 -Indicate if building has a fire alarm. -Indicate if carbon dioxide enrichment system will be used now or in the future. If used, separate permits will be required for operation and installation of gas detection alarm. The gas detection alarm is a deferred submittal and shall be added to the deferred submittals on page G1.0. Installation of CO2 enrichement system will require mechanical ventilation upon activation. Also provide all CO2 documentation IFC 5307.4.1. See IFC 5307.4 for all requirements. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/04/2022 | NGARCIA3 | OUT TO CUSTOMER | Completed |