Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T21CM04800
Review Name: OTHER
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/07/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. The arial photo is to blurry to interpret what it is. Provide a site plan showing the location of the new 400 amp service location and any other existing electrical services on or in the building. If there are any existing services, justify the reason for an additional service and compliance with NEC 230.2. Provide a complete electrical line diagram including load calculations, AIC rating for the service equipment and any downstream electrical panels. Is the Service single phase or three phase? Show all feeder conduits, conductor sizes and types, overhead and or underground including secondary feeders. Be advised, if the plan submittal is not sufficient for the plan reviewer to determine code compliance, a plan designed and sealed by an Electrical Engineer may be required per Arizona Revised Statutes and the Arizona Board of Technical Registration. R4-30-302. City of Tucson Commercial Plan Submittal Requirements. Ref; 2018 IBC sec 107.2.1, 2017 NEC, City of Tucson Commercial Permit/Plan Submittal Requirements. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/08/2021 | NGARCIA3 | OUT TO CUSTOMER | Completed |