Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T21CM04764
Parcel: 136170500

Address:
8618 E RUBY DR

Review Status: Completed

Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO

Permit Number - T21CM04764
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/09/2021 SBLOOD1 ENGINEERING REVIEW Passed
06/23/2021 IMONSHI1 ZONING REVIEW Reqs Change FROM: Iman Monshizadeh

PDSD Zoning Review Section



PROJECT: T21CM04764 – Shed addition

Building Plan Review (1st Review)

8618 E Ruby/ R-1 Zoning

TRANSMITTAL DATE: 6/22/21



DUE DATE: 6/23/21



COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.





1.COMMENT: Provide a complete site plan on the next submittal with accurate representation of the lot and all structures on the property. A sample of a site plan can be found at

https://www.tucsonaz.gov/files/pdsd/forms/Residential_Plot_Plan_Requirements.pdf



Include all information shown on the sample site plan on the next submittal including lot coverage calculations, heights and adjacent zoning.



2.COMMENT: Show the correct orientation of the lot in the next submittal.



3.COMMENT: If both sheds are to be setback 3’ from the east and west respectively, then neighbor signoffs will be required for both the neighbor to the east and the west of the subject property.



4.COMMENT: the neighbor signoff statements and signatures must be placed on the site plan on the next submittal. They cannot be included as a separate page, ensure the signoff are included on the site plan on the next submittal.





If you have any questions about this transmittal, Contact Iman Monshizadeh by email Iman.Monshizadeh@tucsonaz.gov or contact Elisa Hamblin, at Elisa.Hamblin@tucsonaz.gov
06/23/2021 IMONSHI1 NPPO REVIEW Passed
07/01/2021 KEN VAN KARSEN BUILDING-RESIDENTIAL REVIEW Reqs Change Show the circuit size and location of outlets