Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Permit Number - T21CM04551
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/01/2021 | SBLOOD1 | ENGINEERING | REVIEW | Passed | |
| 06/08/2021 | NMARTEL1 | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL Nicholas Martell, Planner T21CM04551 Sleeping Quarters June 8, 2021 The residential plans have been reviewed by the Zoning Review Section but cannot be approved until all zoning comments or concerns have been addressed. 1. It appears that there are currently 3 dwelling units on the property. Any residential development with 3 or more dwelling units is considered a commercial project. If there are fewer than 3 dwelling units on the lot, please resubmit the plans with a full floor plan showing the details of each building on the property. a. If there are 3 or more dwelling units, please resubmit the project as a Development Package (DP). More information about the DP can be found here: https://www.tucsonaz.gov/pdsd/apply-permit#Development%20Package b. A dwelling unit is defined as "A building or portion of a building that is designed, occupied, or intended for occupancy as living quarters exclusively for a single household, which includes one or more rooms, whith sleeping and sanitary facilities and one enclosed kitchen." When determining what a full kitchen entails, zoning checks that there is no more than one single basin sink, no full oven range, and nothing bigger than an under the counter refrigerator. Zoning will determine the amount of dwelling units on the property by counting how many full kitchens are on site. 2. Zoning is unable to determine if the sleeping quarters has a full refrigerator. If the refrigerator meets the standards for a sleeping quarters (under counter fridge), then it will not be considered a full dweeling unit. Please ensure that the plans clearly show the size of the refrigerator. " Please either address these comments and resubmit the plans, or refer to the link posted above and apply for the development package. If you have any questions about this transmittal, please contact me at Nicholas.Martell@tucsonaz.gov |
| 06/24/2021 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Reqs Change | T21CM04551 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. PLUMBING PLANS: 1. Tucson Water Department limits 5/8" water meters to a maximum of 11 IRC fixture units or 15 gallons per minute. Show the existing compliant size or a ¾" water meter upgrade. 2. Show the trap/trap arm size as required by P3201.7. The minimum water closet pipe diameter is 3”. MECHANICAL PLANS: 1. Provide demand calculations in accordance with Manual J/S/D standards, M1401.3, M1601.1. Systems shall be sized in accordance with Manual S based on building loads calculated in accordance with Manual J and duct systems sized in accordance with Manual D. Notate if the mechanical system calculations may be provided by deferred submittal. ELECTRICAL PLANS: 1. Provide a Riser Diagram with a single service panel and a sub-panel to the second building, E3607.3. Clarify the location of the property service meter and coordinate the utility plan with Tucson Electric Power. 2. Show receptacle outlets at each kitchen counter with no point along the wall line more than 24” from a receptacle outlet, E3901.4.1. Show receptacles within 2’ of counter edges or corners and no more than 4’ apart. 3. Island or peninsular counter tops require at least one receptacle outlet within 12” below the countertop surface, E3901.4.2 and E3901.4.3. 4. Show two or more 2O AMP small appliance circuits at the kitchen countertop receptacle outlets; they may also serve the breakfast room and dining room, but not other locations, E3703.2 and E3901.3. If you have any questions, please contact: Ken Van Karsen (520) 837-4912 City of Tucson Residential Plan Review |
| 06/28/2021 | AWARNER1 | NPPO | REVIEW | Passed |