Permit Number: T21CM04201
Parcel: 116206300

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T21CM04201
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/18/2021 JPEELDA1 FIRE REVIEW Approved
05/19/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Complete the calculations for the minimum required plumbing fixtures shown on sheet G0.0. Provide the basis for the calculations (i.e. area), the trave route and distance to the plumbing fixtures.
2. Provide the number of drinking fountains that complies with the requirements of Sections 2902.1 and 2902.5, IBC 2018 and Section 410.3, IPC 2018.
3. Provide a service sink for this mercantile area. Reference: Section 2902.1, IBC 2018.
05/19/2021 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Show the route and termination of the condensate drain in this plan set. Reference: Section 107.2.1, IBC 2018.
05/19/2021 ROBERT SHERRY WATER REVIEW Completed
06/01/2021 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet G0.0; Code Review (Amenities): Please indicate the number of drinking fountains provided.
2. Sheet G0.0; Key Plan: Please indicate on this plan the maximum travel distance to the required toilet facilities meets the requirements of the IBC Section 2902.3.3. Indicate those travel distances on the Key Plan.
3. Sheet G0.0; Code Review (Amenities): Please indicate the total number of plumbing fixtures required for this facility (all tenants) is met per the IBC Table 2902.1. This should include the occupants for all tenant/public spaces.
4. Sheet G0.0; Code Review (Amenities): The number of required water closets indicates 2.62, and the number of required lavatories indicates 1.41. Please verify these numbers per the IBC Table 2902.1 and Section 2902.2(3).
5. General: Please provide written responses to all review comments.
06/10/2021 SSHIELD1 ENGINEERING REVIEW Passed
06/10/2021 STEVE SHIELDS ZONING REVIEW Approved
06/10/2021 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
06/15/2021 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Provide complete compliance with the 2018 IECC for the lighting.