Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM03495
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/29/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 04/29/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 04/29/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 04/29/2021 | ROBERT SHERRY | WATER | REVIEW | Passed | |
| 05/11/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet 2; Site Plan: Note 18 indicates a shade structure for the electric control panels (see Section A on Sheet 6). Please provide structural calculations for this structure. In addition, please provide drawings for the foundation details. 2. Sheet 3; Site Plan: Note H indicates a shade structure for the electrical equipment rack. Please provide structural calculations and drawings for this structure. Is this the same structure as at the control panels? |
| 05/19/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 05/27/2021 | SBLOOD1 | ENGINEERING | REVIEW | Approved | |
| 05/27/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | Until DP21-0061 is approved zoning cannot approve this plan |
| 06/02/2021 | LBOWERS1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |