Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T21CM03397
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/03/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 05/17/2021 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM03397 GENERAL: o Provide written responses to all review comments. o Provide a complete plan set. o Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Geotechnical Report is not submitted. Inspector to verify Geotechnical Report for the proposed building per International Building Code 2018, Section 1803.1. 2. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed. AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection. 1. Roof drainage and secondary drains are to comply with IBC 1502.1. BUILDING REVIEW COMMENTS: Approved ELECTRICAL REVIEW COMMENTS Denied E2.1 MECHANICAL POWER PLAN: No electrical issues. New SES panel schedule shown in two locations, on E2.1 and E4.0 E4.0 PANEL SCHEDULES AND CALCULATIONS: Panel L1 shown in SES Panel with 200-amp CB, yet shown on Riser as 100-amp MCB panel. Typically, a 100-amp MCB panel cannot accept 4/0 conductor. Correct or clarify. Note for Panels A and H not clear. Potentially??? Call out as existing. If there is a high probability of a hazardous code violation or abuse of NEC tap rules, design to correct. Where does existing panel P1 get power from? Subpanel of panel P? MECHANICAL REVIEW COMMENTS: Conditionally Approved NOTE: Every effort has been made to identify code violations. Any oversight by the reviewer shall not be considered as authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The designer is responsible for following all applicable federal, state, and municipal codes and ordinances. PLUMBING REVIEW COMMENTS: Denied 412.11 Automatic faucets. New or replacement faucets serving lavatories in all buildings other than R3 occupancies, individual units in R2 occupancies, or International Residential Code structures shall be provided with automatic faucets in accordance with 419.6. Demonstrate compliance. Update plans. ADD new section 419.6 to read: 419.6 Automatic faucets. Lavatories installed in all buildings other than R3 occupancies, individual units of R2 occupancies, or International Residential Code structures shall be provided with automatic faucets dispensing a maximum of 0.25 gallon per metering cycle. Demonstrate compliance. Update plans. |
| 05/18/2021 | JPEELDA1 | FIRE | REVIEW | Reqs Change | we need a letter from Tucson Water stating that the fire flow is 1,750 gpm. We also need to know the distance from the hydrant to the furthest part of the building as the hose lays. The distance needs to be under 400' or fire sprinkler shall be installed. Gate permit required to be obtained from TFD. Please make a note on the drawings and that a KNOX switch will be required. Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 |
| 05/19/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM03397 10505 S Wilmot Rd TPD Evidentiary Vehicle Storage Building (1st Review) TRANSMITTAL DATE: May 19, 2021 This site is located in the RH zone (UDC 4.7.8). Protective Service (government owned and operated only) is a permitted use in this zone (Table 4.8-2) 1. The building plans have been reviewed for compliance with DP21-0065 and although it appears that the building plans match the DP until the DP is approved Zoning cannot approve the building plans. If you have any questions about this transmittal, please contact Elisa Hamblin or Elisa.Hamblin@tucsonaz.gov. |
| 05/26/2021 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | The DP needs to be approved before the building plans. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
| 06/23/2021 | DBENOIT1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/23/2021 | DBENOIT1 | APPROVAL SHELF | Completed |
| 06/23/2021 | DBENOIT1 | OUT TO CUSTOMER | Completed |
| 06/23/2021 | DBENOIT1 | REJECT SHELF | Completed |