Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T21CM03382
Parcel: Unknown

Address:
3894 N ORACLE RD

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T21CM03382
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/28/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
04/28/2021 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Coordinate the building air balance schedule with the ventilation calculations and the HVAC design (e.g. no FC-5 is shown on the mechanical plans; FC-1 and FC-2 require 300 CFM of outside air). Reference: Section 107.2.1, IBC 2018.
2. How was the exhaust flow rate for the existing Type I hood determined? If it is not a listed and labeled hood explain why it should not comply with Section 507.5.2, IMC 2018.
04/28/2021 JPEELDA1 FIRE REVIEW Approved
04/28/2021 ROBERT SHERRY WATER REVIEW Completed
05/06/2021 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
05/17/2021 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.

1. Provide complete compliance with the 2012 Tucson/Pima County Outdoor Lighting Code for the proposed exterior lighting.
2. provide a luminaire schedule for all new luminaires.

3. The panel schedule does not reflect the new mechanical AH’s/HP’s .

4.Provide a complete panel schedule for panel ‘B’.

5.Provide a wiring schematic on the power plan that correlates with note #3 on the kitchen hood schedule, plan sheet M3.

6.Balance the loads between panel phases as close as possible and reflect this on the panel schedules. 163 amps on phase A and 63 amps on phase B, 74 amps on phase C has to wide a margin and is going to cause INDUCTIVE Heating. NEC 408.3B.

7.Identify on the electrical plans any changes to the interior lighting.

Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2012 Tucson/Pima County Outdoor Lighting Code,

City of Tucson Commercial Plan Submittal Requirements
05/24/2021 SBLOOD1 ENGINEERING REVIEW Passed
05/24/2021 STEVE SHIELDS ZONING REVIEW Approved
05/24/2021 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed