Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM03382
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/28/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
04/28/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Coordinate the building air balance schedule with the ventilation calculations and the HVAC design (e.g. no FC-5 is shown on the mechanical plans; FC-1 and FC-2 require 300 CFM of outside air). Reference: Section 107.2.1, IBC 2018. 2. How was the exhaust flow rate for the existing Type I hood determined? If it is not a listed and labeled hood explain why it should not comply with Section 507.5.2, IMC 2018. |
04/28/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
04/28/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
05/06/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
05/17/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Provide complete compliance with the 2012 Tucson/Pima County Outdoor Lighting Code for the proposed exterior lighting. 2. provide a luminaire schedule for all new luminaires. 3. The panel schedule does not reflect the new mechanical AH’s/HP’s . 4.Provide a complete panel schedule for panel ‘B’. 5.Provide a wiring schematic on the power plan that correlates with note #3 on the kitchen hood schedule, plan sheet M3. 6.Balance the loads between panel phases as close as possible and reflect this on the panel schedules. 163 amps on phase A and 63 amps on phase B, 74 amps on phase C has to wide a margin and is going to cause INDUCTIVE Heating. NEC 408.3B. 7.Identify on the electrical plans any changes to the interior lighting. Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2012 Tucson/Pima County Outdoor Lighting Code, City of Tucson Commercial Plan Submittal Requirements |
05/24/2021 | SBLOOD1 | ENGINEERING | REVIEW | Passed | |
05/24/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
05/24/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |