Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 2ND
Permit Number - T21CM03167
Review Name: REVISION - - 2ND
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/31/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM03167 40 E Congress St Food Service TRANSMITTAL: August 31, 2021 This site is located in the OCR-2 zone (UDC 4.7.27). Food service is a permitted use. 1. As you are proposing an outdoor patio area within the right-of-way and the patio is not shown on the last approved development package (DP), DP16-0202, a revision to the DP is required prior to approval of this plan. The patio will require approval by COT DTM Real Estate prior to approval by Zonine If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. |
09/15/2021 | MGAYOSS1 | DESIGN PROFESSIONAL | REVIEW | Approved | DATE: September 15, 2021 FROM: Corky Poster, Architect/Planner (AICP), City of Tucson On-Call Design Professional RE: IID-16-02 DP 6-23-21 City Park Change, 20 East Congress OWNER: Bourne Companies ARCHITECT: Cypress Civil Development/FORS Architecture PHASE OF REVIEW: Review of Construction Documents to insure that the changes proposed in red and green below and approved by the P&DS Director on June 30, 2021, and further described in the Revision Narrative by FORS dated August 23, 2021, are memorialized and included in the Revised 4_Plan Set with Revision 4 dated 8-23-21 noted, reflecting changes in Exterior Food Service Use and Building Exiting. The Design Professional reviewed Revision 4 notes on sheets: A0.1 Cover Data A1.0 Site Plan A0.2 Exit Plan A3.0 Reference Plan A3.1 Dimension Plan A3.2 Furniture Plan A8.2 Exterior Courtyard Elevations A8.3 Exterior Courtyard Elevations A9.3 Code Details - Ramp Detail No. 4 MATERIAL REVIEWED: P&DS Director memo of June 30, 2021, Revision Narrative by FORS dated August 23, 2021, and the Revised 4_Plan Set with Revision 4 dated 8-23-21. FINDINGS OF DESIGN PROFESSIONAL: The Design Professional has reviewed the 9 sheets of August 23, 2021 drawings and they are fully consistent with the previous design review approved changes and the Director’s decision letter. |
10/26/2021 | STANTEC | 3RD PARTY REVIEW-RESIDENTIAL | AT 3RD PARTY OFFICE | Completed | |
10/26/2021 | STANTEC | 3RD PARTY REVIEW-RESIDENTIAL | REVIEW | Completed | |
12/01/2021 | FRANK PODGORSKI | HPZ ADVISORY BOARD DECISION REC'D | HPZ ADVISORY BOARD DECISION | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/01/2021 | VVERA1 | OUT TO CUSTOMER | Completed |