Permit Number: T21CM03108
Parcel: 141186320

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T21CM03108
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/21/2021 JPEELDA1 FIRE REVIEW Approved
04/26/2021 ROBERT SHERRY WATER REVIEW Completed
04/28/2021 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T21CM03108

GENERAL:
o Provide written responses to all review comments.
o Provide a complete plan set.
o Provide additional documents as requested by review staff.

STRUCTURAL REVIEW COMMENTS:
Denied
1. Verify the Roof Joists and Joist Girders are capable of supporting additional loads from the new condenser units being
added at the roof. Support your response with Structural Calculations.
2. All Calculations shall be sealed and signed by Professional Engineer registered with State of Arizona per Section 107.1
of International Building Code 2018.
BUILDING REVIEW COMMENTS:
Approved

ELECTRICAL REVIEW COMMENTS
Denied
E1 LIGHTING PLAN: No electrical issues
E1.1 ENLARGED LIGHTING PLANS AND SCHEDULE: No electrical issues
E2 POWER PLAN: No electrical issues
E2.1 POWER DROP PLAN: No electrical issues
E2.2 ENLARGED POWER PLANS: No electrical issues
E3 ELECTRICAL DETAILS: No electrical issues
E4 PANELBOARD SCHEDULES: No electrical issues
E4.1 PANELBOARD SCHEDULES: No electrical issues
EPH1 PHARMACY ELECTRICAL PLAN: No electrical issues
RE1 REFRIGERATION ELECTRICAL PLAN: No electrical issues
GE1 GROCERY LIGHTING PLANS: No electrical issues
GE2 GROCERY POWER PLANS: No electrical issues

MECHANICAL REVIEW COMMENTS:
Denied
1. Show rooftop gas equipment types, calculations and locations per 2018 IMC 301.
2. Provide rooftop equipment utility connection information per 2018 IMC 301.
3. Show all new equipment refrigeration types and locations per 2018 IMC 1103.
4. Provide existing and new duct work insulation types and locations per 2018 IMC 604.
5. Show existing and new equipment shut down device locations per 2018 IMC 606.
6. Provide existing and new exposed duct work support spacing per 2018 IMC 603.
7. Show rooftop equipment stands fire resistant construction details per 2018 IBC 601.

PLUMBING REVIEW COMMENTS:
Approved with comments:
Floor drains must have deep seal traps or trap primers and fixtures must have air gaps per plumbing code.., McGraw-Hill, Inc., page 1028. o A minimum of 25% storage is required for floatable fats, oil
and grease and settled solids is required for gravity grease interceptors. o The minimum sized GGI to be installed shall be
300 gallons.
05/05/2021 SSHIELD1 ENGINEERING REVIEW Passed
05/05/2021 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
05/05/2021 STEVE SHIELDS ZONING REVIEW Approved