Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM02897
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/13/2021 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide the size of the water meter serving this suite, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018. |
| 04/13/2021 | JGARCIA1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 04/14/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 04/16/2021 | SBLOOD1 | ENGINEERING | REVIEW | Passed | |
| 04/27/2021 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM02897 GENERAL: o Provide written responses to all review comments. o Provide a complete plan set. o Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: NA BUILDING REVIEW COMMENTS: Denied 1. Provide clarification for Accessible RR #1. The clearance width of the toilet does not comply with Section 604.3.1 of ANSI A117.1. Electrical Review NA MECHANICAL REVIEW COMMENTS: Denied 1. If any work is being completed on the mechanical systems, please provide all drawings required. Show existing and new locations of diffusers. Show all work being completed. PLUMBING REVIEW COMMENTS: Denied 1. If any work is being completed on the plumbing systems, please provide all drawings required. Show all work being completed. |
| 05/03/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved |