Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T21CM02586
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/30/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The first-floor elevation must be 12-inches or more above the rim elevation of the next upstream manhole to not require a backwater valve. In addition, the elevations shown on the drawing are about 1200-feet below grade level for the building. [Initial comment: Provide the rim elevation of the next upstream sanitary manhole and the first-floor elevation. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson.] |
| 07/01/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the structural calculations to include the weight of a person working on the hood, coordinate the number of support points with the design of the hood (i.e. the hood has support points at each end but none in the middle of the hood), and revise the brace loads and connection loads. [Initial comment: The equipment submittals for the proposed Type I grease hood and supply air plenum show the equipment suspended from the overhead structure. Verify that the attachment method shown on detail 2/S1.0 complies with the manufacturer’s installation requirements. Reference: Section 304.1 and 507.2.4, IMC 2018.] 2. Provide a detail showing how the guards are to be constructed and attached to the building. [Initial comment: Verify that the parapet height within ten feet of exhaust fan EF-1 is at least 42” above the walking surface of the roof or provide guards for the fan per Section 304.11, IMC 2018.] |
| 07/09/2021 | SBLOOD1 | ENGINEERING | REVIEW | Approved |