Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T21CM02266
Parcel: 12217274A

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T21CM02266
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/31/2022 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change The revised COMcheck has not been submitted. [Fourth comment: The architectural plan, A-7.0, calls for R-38 Batt insulation in roof but COMcheck calls for R-25 continuous insulation.] [Third comment: Comment not resolved. Coordinate the COMcheck envelope insulation components with the building sections (A-7.0).] [Second comment: Comment not resolved. No envelope COMcheck provided.] [Initial comment: Demonstrate energy code compliance for the building envelope using calculations based on the current code (e.g. provide COMcheck). Reference: Sections C101.5, C103.2, C303, and C401.2, International Energy Conservation Code 2018.]
01/31/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Provide the civil plans showing the installation of the site utilities as a part of the drawing set (i.e. not "for reference only"). The drawings P1.0 and P1.1 refer to the civil drawings for the installation of the grease interceptor, building sewer, and the water service to the building. A development plan cannot be used to construct the site utilities. [Fourth comment: The civil plan does not show the location of the reduced pressure backflow preventer and the size of the water service is not coordinated with the plumbing plan.] [Third comment: Civil utility plans cannot be "For Reference Only." An approved development plan is not to be used for construction of on-site utilities.] [Second comment: Comment not addressed; no civil plans provided.] [Initial comment: An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Provide the civil plans showing the installation of the water service to the building, the installation of the building sewer, and the installation of the proposed fountain as part of the building plan set. Reference: Sections 107.2.1 and 107.2.6, IBC 2018.]