Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T21CM02266
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/14/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM02266 3435 E Speedway Blvd. Food Service TRANSMITTAL: December 14, 2021 This site is located in the C-2 zone (UDC 4.7.21). Food Service is a permitted use in this zone (Table 4.8-4) subject to Use Specific Standards 4.9.4.M.1 and 4.9.13.P. Provide a detail comment response letter with the next submittal. 1. Zoning cannot approve the building plan until the DP is approved. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. |
| 12/14/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Civil utility plans cannot be "For Reference Only." An approved development plan is not to be used for construction of on-site utilities. [Second comment: Comment not addressed; no civil plans provided.] [Initial comment: An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Provide the civil plans showing the installation of the water service to the building, the installation of the building sewer, and the installation of the proposed fountain as part of the building plan set. Reference: Sections 107.2.1 and 107.2.6, IBC 2018.] 2. Comment not resolved, still no SCW to ice machine, but SCW supplied to ovens. [Second comment: Comment not resolved; the drawings are not coordinated. Ice maker (K470, on P1.1, K414 on E2.0) is shown in same location as Hood 1 for "Just Baked Oven", K535 on M-2.0.] [Initial comment: Coordinate the plumbing plans with the equipment locations shown in the kitchen plans. For example, sheet P1.1 shows SCW being supplied to the ice machine but in the location of an oven while no SCW is being supplied to the location of the ice machine. Reference: Section 107.2.1, IBC 2018.] |
| 12/14/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Comment not resolved. Coordinate the COMcheck envelope insulation components with the building sections (A-7.0). [Second comment: Comment not resolved. No envelope COMcheck provided.] [Initial comment: Demonstrate energy code compliance for the building envelope using calculations based on the current code (e.g. provide COMcheck). Reference: Sections C101.5, C103.2, C303, and C401.2, International Energy Conservation Code 2018.] |