Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM02179
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/11/2021 | DTRAMME1 | ENGINEERING | REVIEW | Passed | |
03/15/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
03/25/2021 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
03/25/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet G001; Code Statistics (Occupant Load): The total SF indicates 12,604. That number does not include the Assembly areas of 242 SF, 143 SF, and 488 SF. Please coordinate. 2. Sheet G001; Code Statistics (Means of Egress): The exit width required is based on 178 occupants, which is indicated as 241 occupants in the Occupant Load Calculation. Please coordinate. 3. Sheet G001; Egress Plan: Exit E does not indicate the exiting information (clear opening width, clear width per occupant, etc.). Please provide on this plan. 4. Sheet A100; Site Plan: The Scope of Work on the plan indicates three existing spaces with a total of 17,838 SF, while the Code Statistics on Sheet G001 indicate 13,477 SF. Please coordinate. 5. Sheet A101; Floor Plan: Are Wall Tags intended to be shown on this plan? Please verify. 6. General: Please provide the Special Inspections Certificate with Parts A and B completed. This form may be found at www.tucsonaz.gov/PDSD. 7. General: Please provide written responses to all review comments. |
03/31/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | The City of Tucson has not adopted ASHRAE Standard 62-1 as an approved method for calculating ventilation requirements. Provide calculations to show that the ventilation system is sized in accordance with Section 403.3.1, IMC 2018. |
03/31/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. 2. Provide structural calculations for the mounting shelf for the water heater to show that the water heater will be safely supported from the building structure. Reference: Section 301.2, IPC 2018. 3. Appliances (e.g. coffee makers, ice makers, etc.) to be directly connected to the water supply system that do not have listed, integral backflow preventers or integral air gaps conforming to Section 608.14.1, IPC 2018 require backflow prevention. Specify the type of backflow prevention device required for each water connection. At a minimum, coffee makers require the use of a backflow preventer listed to either ASSE 1022, ASSE 1024, or an air gap. Reference: Sections 608.1, 608.3, and 608.17.1.2, IPC 2018. |
03/31/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
04/07/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
04/09/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved |