Permit Number: T21CM02176
Parcel: 112043060

Review Status: Completed

Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO

Permit Number - T21CM02176
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/05/2021 NMARTEL1 ZONING REVIEW Reqs Change PDSD TRANSMITTAL
Nicholas Martell, Planner
T21CM02176
New Guest House, SFR
March 25, 2021

The residential plans have been reviewed by the Zoning Review Section but cannot be approved until all zoning comments or concerns have been addressed.

Please resubmit the plans addressing the following comments:

1. Provide full elevation measurements for every side of the new residence. This is used for zoning to determine the required setbacks, and height limitations. In the R-1 zone the height maximum is 25'. Setbacks from a residential use to a residential zone are 6' or 2/3 the height of the building, whichever is greater. It does not appear as though the east, and possibly the south setbacks will be sufficient. The applicant may appy for a Design Development Option (DDO) to reduce those setbacks; but zoning requires completed elevation measurements before that process can be started. The DDO packet can be found here: https://www.tucsonaz.gov/files/pdsd/forms/DDO_for_Setback_and_Height_UDC_8.11.20.pdf

2. Any lot with two residences and 5 or more bedrooms total must have parking spaces developed to a commercial standard. More information is needed regarding the amount of bedrooms in the existing residence to provide a correct parking count. Please include a floor plan of both houses.

3. Please address the structure at the south of the property. It appears to be unpermitted. If that structure is to remain it must be added to the permit, and will likely require a DDO to remain in its current location. If it is no longer present, or to be removed, please indicate.

If you have any questions about this transmittal, please contact me at Nicholas.Martell@tucsonaz.gov
04/05/2021 KEN VAN KARSEN BUILDING-RESIDENTIAL REVIEW Reqs Change T21CM02176
PLAN REVIEW COMMENTS

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions.

SCOPE OF REVIEW:

The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

GENERAL REQUIREMENTS:

A new dwelling unit (includes a kitchen) requires collection of development impact fee when the building permit is processed, City of Tucson Ordinance #11203.

Each dwelling unit building requires a separate street address, R319. Update the plans showing the Pima County assigned street address for all units on the property.

GENERAL COMMENTS:

1. A dwelling unit providing complete independent living facilities requires compliance with design ordinances for handicap, solar water, photo-voltaic and gray water preparations. Design Ordinances adopted by the City of Tucson.
2. Show compliance with the Inclusive Home Design Ordinance adopted by the City of Tucson Ordinance #10463 on 10/16/2007. Notate accessible route, minimum door width, changes in floor elevation, door hardware, electrical outlet reach range, grab bar reinforcement, etc.
3. All SFR and Duplex plans submitted after March 1, 2009 require a solar water system, or future installation preparation City of Tucson Ordinance #10549 with one of the following provisions: ½”control conduit and two ¾” copper piping for water with rooftop termination; straight 3” capped sleeve; or an accessible attic (clear path 30” wide x 30” high) over the water heater. Show appropriate notation.
4. All SFR and Duplex plans submitted after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 .
a. Show a minimum 300 SF clear solar-ready zone on a roof or framing plan, T103.3. Model plans should show four typical south facing roof surfaces.
b. Label a double breaker space for future Photo Voltaic on the panel schedule opposite end from the main/supply side, T103.9.
5. All construction drawings submitted after June 1, 2010 for one- or two-family dwellings must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. Include two clothes washer standpipes, one with an above grade stub-out, and one to the building drain; also provide gray drain-line discharge of all second story bathing fixtures through an exterior-wall drop for future gravity distribution. Add the appropriate detail found at the web site: https://www.tucsonaz.gov/files/pdsd/codes-ordinances/Grey_Water_Options_FINAL_.pdf

SITE PLAN:

1. Indicate the location and size of the water line from property line (meter) to building, R106.1.1. Show an existing or upgraded 1” line to the water heater. Minimum size for a two bathroom building is usually 1”, P2903.7.

FLOOR PLANS:

1. Show a maximum ½” floor elevation changes at a notated accessible route entrance on the floor plan, R106.1.1.
2. Provide the square footage and dimensions of the basement, R106.1.1.
3. Show the location of the basement stairway, R106.1.1.
4. Provide an emergency escape and rescue opening from the basement in compliance with R310.

STRUCTURAL PLANS:

1. Provide engineered calculations and seal of the basement structure for the non-prescriptive basement design, R301.1.
2. Provide engineered calculations and seal of the roof structure for the non-prescriptive roof framing, R301.1.
3. Provide a framing plan and header schedule showing opening sizes supporting the roof structure consistent with Table 502.5(1) & R602.7(1).

SECTIONS - DETAILS:

1. Show exterior wood siding, sheathing and wall framing with a 6” clearance above the ground (R317.1 item 5).
2. Clarify the placement of ceiling/roof insulation for determining the need for attic ventilation, R806.
3. An unvented roof assembly requires an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing, R806.5. Show a roof design with insulation types and minimum thickness for meeting the condensation control requirement and the minimum total insulation value of R-38.
4. A vented attic space requires a calculation for showing the attic ventilation opening size using 1 to 150 of attic area in compliance with R806.2. Provide appropriate upper and lower space vents when applying the reduced area calculation.

PLUMBING PLANS:

1. Show an individual water heater for each dwelling unit, P2801.1.
2. Show an individual accessible water supply shut off for each dwelling unit, P2903.9.1.
3. Provide the water pipe diameter between the meter and shut off valve in compliance with P2903.7. A minimum 1” service pipe is required for supplying water to more than 9.5 fixture units.
4. Provide devices rated for application, G2406.3. A two-way valve is not appropriate for building drainage. Show a gray drain line to the building exterior without a diverter valve and appropriate connections to the sewer system, or provide the spec sheet for an compliant diverter for drainage applications.
5. Show gas pipe sizes in compliance with connected demand, G2413.3 & Table G2413.4(1). Provide a 1” gas line between the meter and first branch connection.

ELECTRICAL PLANS:

1. TEP usually requires the service panel on the property at the closest building to the service transformer. Show the service to the existing dwelling and any alterations.
2. Provide separation of all circuits for each dwelling unit, E3601.3. Remove the (ckt #25/27) 100 AMP sub panel from the Electrical Plan.
3. Show all receptacle outlets located in the unfinished basement with ground fault circuit interrupting protection, E3902.

INTERNATIONAL ENERGY CONSERVATION CODE:

1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans.

Please contact the plans reviewer if you have any questions:
Ken Van Karsen
(520) 837-4912 PDSD-Residential@tucsonaz.gov
City of Tucson Residential Plan Review
04/13/2021 JPEELDA1 FIRE REVIEW Approved
04/14/2021 LOREN MAKUS ENGINEERING REVIEW Approved This project is within a mapped flood hazard area and requires a Floodplain Use Permit (FUP.)
Please start a new FUP at our permit application web page: https://docs.tucsonaz.gov/Forms/tucsonpermitapp.
Instructions:
1. Is this for a new or existing activity application? - Please select New Application.

2. Submission Type - Select Floodplain Use Permit.

3. Project Name - Enter a name for your project.

4. Select Street Name from the list. You can type the first two letters or number to get closer to your choice in the list. Then select the rest of the address in the boxes provided.

5. Type of Permit - Select Commercial or Residential (Residential is for work on single family residences and duplexes.)

6. Complete the Applicant Info. (Note APA# is for applicants with an advance payment account. Leave blank is you do not have an APA account.

7. Complete the Contractor, Owner and Architect/Engineer sections as applicable.

8. Supporting Documentation Upload - Provide a complete cost estimate for the project. You may also provide additional documents you think will be helpful.

9. Sign the application and submit.
04/23/2021 LBOWERS1 NPPO REVIEW Needs Review