Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T21CM01958
Review Name: OTHER
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/05/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. General: Drawings for a new C of O must be prepared by a registered design professional and include a site plan, a building plan, and a code analysis (occupancy classification, SF, construction type, occupant load). All drawings must be sealed, signed, and dated by the registered design professional. 2. General: Please indicate in the code analysis if this is a change of occupancy classification from the previous tenant, and if so, the occupancy classification of the previous tenant. 3. General: Please indicate on the building plan if any new construction or demolition is included in this permit. If so, please provide a project valuation (labor + materials) on the drawings. 4. General: Please provide written responses to all review comments. |
| 04/08/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/09/2021 | IMONSHI1 | OUT TO CUSTOMER | Completed |