Permit Number: T21CM01713
Parcel: 132166490

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T21CM01713
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/15/2021 JPEELDA1 FIRE REVIEW Approved
03/23/2021 ROBERT SHERRY WATER REVIEW Completed
04/01/2021 STEVE SHIELDS ZONING REVIEW Reqs Change ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
T21CM01713
975 E Macarthur Cir.

TRANSMITTAL: April 1, 2021
This site is located in the I-1 zone.

1. As this is a commercial site a Development Package (DP), commercial site plan, is required to be submitted and approved prior to approval of the building plans. This DP shall meet the requirements of Administrative Manual (AM) 2-06. AM 2-06 requirements can be found at: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-1.

The DP is a separate submittal from the building plans and must be submitted at: https://docs.tucsonaz.gov/Forms/tucsonpermitapp.
Under “Submission Type*” “Site Review”
Until the DP is approved Zoning cannot approve the building plans.

If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov
04/01/2021 SSHIELD1 ENGINEERING REVIEW Reqs Change SEE ZONING COMMENTS
04/05/2021 JGARCIA1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
04/05/2021 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T21CM01713

GENERAL:
1. Provide written responses to all review comments.
2. Provide a complete plan set.
3. Provide additional documents as requested by review staff.

STRUCTURAL REVIEW COMMENTS:
Daljit Benipal
Denied
Reason:
1. Provide missing Plan/Section for Foundation F-4 as provided by Foundations F-1, F-2 and F-3 on Drawing A-3.
2. Drawing A-5, Roof Plan shows a slope of 5:12. Verify and Revise Drawing to show actual proposed slope.
3. Provide Wind Load Calculations for the Building per Section 1609 of International Building Code 2018.
4. Provide Seismic Calculations for the Building per Section 1613 of International Building Code 2018. 5. All Calculations shall be sealed and signed by Professional Engineer registered with State of Arizona per Section 107.1 of International Building Code 2018.
6. Roof drainage and secondary drains are to comply with IBC 2018 Section 1502.1.
7. Structural steel, components and fasteners for the roof screen are to be protected against corrosion in accordance with AISC 360 Section B.13 as indicated in IBC 2018 Section 2203.1.

BUILDING REVIEW COMMENTS:
Brian Washko
Denied
Reason:
1. Revise plans to include project description listed on cover sheet. Please provide project description. IBC 107.1
2. Revise plans to indicate occupancy load, please provide occupancy load calculations IBC 107.1
3. Revise plans to indicate window and door schedule. IBC 107.1
4. Revise plans to indicate access route outside and within the building; provide accessible parking lot dimensions. Accessible parking to be located close to main entrance of building. BC 107.1 , 1104.1ANSI 117.1.
5. Revise electrical plan to indicate GKCI outlet next to sink in utility room and corridor work station. NEC 210.8

ELECTRICAL REVIEW COMMENTS:
Ron Ross
Denied Reason:
Electrical Review: By: Ron Ross PE
E-0 ELECTRICAL SCHEDULES: Main building’s disconnect is not sized and also needs to call out required AIC rating, only shows calculated demand load of 198 amps.
E-1 ELECTRICAL SITE PLAN: Panels A & B should have the KAIC ratings called out on the panel
schedule or reference Note 1 on Sheet E-0.
E-2.1 POWER & OUTLET PLAN: Circuit receptacle for B-15 next to sink needs to be GFI protected per NEC. Circuit receptacles for A-13,15 and A-23 next to sinks need to be GFI protected per NEC.
E-2.2 LIGHTING PLAN: No electrical comments.

MECHANICAL REVIEW COMMENTS:
Elizabeth Prida
Denied Reason:
1-Provide COMcheck-Mechanical Calculations as per IECC-401.2
2-Provide duct smoke detector as per IMC-606.2
3-Provide RTU with roof access as per IMC-306.5
4-Show on detail the dryer vent annular space shall be sealed as per IMC-504.2
5-Show ceiling access panel dimensions for inline fan EF-4 mounted above ceiling. FMC-306.1

PLUMBING REVIEW COMMENTS:
Elizabeth Prida
Denied Reason:
1-Provide energy calculations as per IECC-C401.2
2-Provide clothes washer with discharge interceptor. IPC-1003.6
3-Provide GWH with temperature limiting means as per IPC-607.1.1
4-Provide Facility Plumbing Fixture Calculations. IPC-Table-403.1. Provide HI/LO Drinking Fountain.
5-Provide a drain pan for water heater. Show drain size, material and point of termination. IPC-504.7

Final Status

Task End Date Reviewer's Name Type of Review Description
04/06/2021 IMONSHI1 OUT TO CUSTOMER Completed