Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM01661
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/30/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. Plan sheet PV2 shows Enphase Micro inverters at the PV Modules and the electrical design also calls out to use a Fronius Inverter. Please verify this is correct. Provide a grounding detail for the Racking and Structural Steel and verify compliance with NEC art, 690.43A,B. Provide more detail for the supply side tap. Wiring methods .Verify per the manufacturer of the service panel that intercepting the conductors inside the panel will in no way compromise the performance or Listing of the All-in-One service panel. Verify that the DG Disconnect switch is suitable for use as service equipment. NEC 690.13C. Ref; 2017 NEC |
03/30/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheets Cover, PV1, and PV2: These sheets must be sealed, signed, and dated by a registered design professional. Please provide. 2. Sheet S1.0; Detail 101: Please indicate on this detail the required length of the concrete drilled shaft into the soil, and the diameter of the concrete drilled shaft. 3. General: Please provide a Special Inspections Certificate with Parts A and B completed. 4. General: Please provide written responses to all review comments. |
04/01/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM01661 703 N Swan Rd New shade structure w/ Solar TRANSMITTAL: April 1, 2021 This site is located in the O-3 zone. 1. As this is a commercial site and you are proposing a new structure a Development Package (DP), commercial site plan, is required to be submitted and approved prior to approval of the building plans. At a minimum the DP must meet the requirements of the Checklist for Minor Development Changes to Existing Commercial/Industrial Sites found at: https://www.tucsonaz.gov/files/pdsd/forms/Minor_Changes_to_Commercial_Industrial_Sites_.pdf. The DP is a separate submittal from the building plans and must be submitted at: https://docs.tucsonaz.gov/Forms/tucsonpermitapp. Under “Submission Type*” “Site Review” Until the DP is approved Zoning cannot approve the building plans. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov |
04/02/2021 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | See zoning comments on needing a Development Package submitted and approved before this building permit can be approved. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |