Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM01620
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/17/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. Provide a Rapid Shutdown warning label and apply as directed per NEC art 690.12(C) and 690.56(C)1,2,3. Provide a grounding detail for the racking and or steel mounting structure, and verify compliance with NEC art 690.43. Indicate on the plans wiring methods and supports for routing the DC source conductors from the PV Modules to the inverters. NEC art 300 and 690.31. It appears that System #1 and System #2 projects T21CM01619 AND T21CM01620 are assigned to the same electrical service, please verify. If that’s the case, adjustments will have to be made to the electrical design to meet Code requirements. NEC art. 690 and 705. Or if not, then please identify each electrical service on the plans with an address or building identification. |
03/17/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1.0; Code Review: Please remove the 2018 IRC from this list. 2. Sheet A2.0; General Notes: Note 1 indicates the IRC latest edition. Please revise this to the 2018 IBC. 3. Structural Calculations: A registered design professional is required to seal, sign, and date the structural calculations for commercial projects. Please provide. 4. General: All drawings must be sealed, signed, and dated by a registered design professional for commercial projects. Please provide. 5. General: Please provide written responses to all review comments. |
03/26/2021 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Passed | |
03/31/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved |