Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM01073
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/25/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
02/25/2021 | JGARCIA1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
02/25/2021 | DTRAMME1 | ENGINEERING | REVIEW | Passed | |
02/25/2021 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Plans shall show the applicable codes. Plans shall show the occupant load Plans shall show the square footage Plans shall show the egress plans |
03/09/2021 | STEVE SHIELDS | ZONING | REVIEW | Denied | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM01073 505 E 9th St. TI - Perishable Goods Manufacturing TRANSMITTAL: March 9, 2021 This site is located in the C-3 zone (UDC 4.7.22). Perishable Goods Manufacturing is not an allowed use in the zone (Table 4.8-4). 1. Perishable Goods Manufacturing is not an allowed primary use in the C-3 zone. A rezoning is required. At best the propose use is allowed as an accessory use limited to 33% of the gross floor area of the primary use. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov |
03/10/2021 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | GENERAL: Please provide written responses to all review comments BUILDING: Scott Davis Denied Reason: Date Completed : 3/9/2021 1. Submit a life safety plan showing all materials and equipment locations per 2018 IBC 107.2. 2. Submit entire COMcheck mechanical compliance certificate checklist per 2018 IEC C501. 3. Show existing or new fire systems locations and construction details per 2018 IBC 107.2. 4. Provide existing and new door types, sizes, and hardware schedule per 2018 IBC 107.3. 5. Show existing or new handicap accessibility restrooms and details per 2009 ICC A117.1. 6. Provide existing and new parking space location and construction details per site plan. 7. Show existing occupancies and fire separation locations and details per 2018 IBC 508.4. 8. Provide building type of construction and square footage information per 2018 IBC 506.2. 9. Show existing or new emergency exit illumination and exit sign locations per 2018 IBC 1008. 10. Provide existing or new exterior walls and roof insulation information per 2018 IEC C501. 11. Show existing or new restroom door enclosing fixtures to ensure privacy per 2018 IBC 1209. 12. Provide restroom floor, walls and partition nonabsorbent surface details per 2018 IBC 1209. 13. Show existing or new handicap accessibility route location and details per 2009 ICC A117.1. 14. Provide existing roof material locations and construction specifications per 2018 IBC 1507. 15. Show existing masonry walls construction details and specifications per 2018 IBC 1404. 16. Provide new exterior hot water heater enclosure construction details per 2018 IBC 107.2. 17. Show existing electrical panel size, circuits, wires, and load summary per 2018 IBC 107.3. ELECTRICAL: Passed MECHANICAL: Scott Davis Denied Reason: Date Completed : 3/9/2021 1. Show existing and new roof top vent locations and proper clearances per 2018 IMC 801. 2. Provide new ductless heat pump unit exterior case location and details per 2018 IMC 302. 3. 3. Show new equipment vent support locations and construction details per 2018 IMC 802. PLUMBING: Scott Davis Denied Reason: Date Completed : 3/9/2021 1. Show gas piping inspection, testing and purging construction details per 2018 IGC 406. 2. Provide fire partition locations and new piping through wall repair details per 2018 IBC 107.2. 3. 3. Show new gas equipment combustion, ventilation, and dilution air details per 2018 IGC 304. |