Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T21CM00659
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/06/2021 | JVINCEN1 | FIRE | REVIEW | Approved | |
04/06/2021 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM00659 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Drawing S2.2, Shear Wall Plan, shows Shear Walls SW1’s and SW2’s. Provide Details of these Shear Walls. 2. 2. Drawing S4.2, Foundation Details, show Frame 1, Frame 2 and Frame 3 elevations. Locate these on Plan. Also verify if it’s called Foundation Details correctly, make revisions as necessary. 3. 3. Drawing S4.2, Detail 123, 124 and 125, Side View shows Detail 209/S4.1, 208/S4.1, 207/S4.1, 127/S4.1. Provide these Details. 4. 4. Locate Sections 209/S5.1 and 212/S5.1 on Plan. 5. 5. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed. AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection. 6. Roof drainage and secondary drains are to comply with IBC 1502.1. BUILDING REVIEW COMMENTS: Approved ELECTRICAL REVIEW COMMENTS Denied E0.1 ELECTRICAL ONE-LINE, SPECIFICATIONS, LEGENDS & NOTES: No electrical comments E1.1 ELECTRICAL FLOOR PLAN & NOTES: No electrical comments E1.2 ELECTRICAL ROOF PLAN & NOTES: No electrical comments E2.1 ELECTRICAL LIGHTING PLAN & NOTES: No electrical comments E3.1 ELECTRICAL SCHEDULE & CALCULATIONS: Either the Panel P1 or the TEP approved meter can needs to provide circuit protection ie a 200 amp circuit breaker needs to be part of the design. Usually, the design would rely upon a service rated panel (the panel would have a 200-amp service rated CB) or the riser detail (E0.1) would show a CB as part of the meter disconnect. Cannot determine if an approved TEP meter socket provides this circuit protection. MECHANICAL REVIEW COMMENTS: Approved PLUMBING REVIEW COMMENTS: Approved |
04/06/2021 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. The development package must be approved first. 2. Clearly show that primary roof drains are not directed to sidewalk surface. |
04/06/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
04/06/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM00659 8601 E Gold Links Rd New Food Service TRANSMITTAL: February 19, 2021 This site is located in the C-1 zone (UDC 4.7.20). Food Service is a permitted use in this zone (Table 4.8-4) Subject to Use Specific Standards 4.9.4.M.1 & 5 and 4.9.13.O 1. Zoning has reviewed the building plans for compliance with DP21-0004 and although it appears that the building plans match the DP the building plans cannot be approve until the DP is approved. 2. The development package sheets provided in the building plan set either need to be the stamped approved development package sheets, removed from the building plan set or mark as for reference only. If you elect to remove the development packs sheets or mark for reference only, ensure that sheet 6, Utility Plan, stays in the building set and is not marked for reference only. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov |
04/06/2021 | LSHAMIS1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/07/2021 | IMONSHI1 | OUT TO CUSTOMER | Completed |