Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T21CM00503
Parcel: 112012770

Review Status: Completed

Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO

Permit Number - T21CM00503
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/22/2021 SBLOOD1 ENGINEERING REVIEW Passed
02/09/2021 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: T21CM00503
3070 E Weymouth St
Office and Bath Addition
Residential (1st Review)

TRANSMITTAL DATE: February 9, 2021

This site is located in the R-3 zone (UDC 4.7.12). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.6.

1. Provide a residential plot plan that meets the requirements found at: https://www.tucsonaz.gov/files/pdsd/forms/Residential_Plot_Plan_Requirements.pdf
This plot plan will include:
The entire parcel w/distance & bearing
Legal description
Lot coverage calculation
Zoning of this parcel and all adjacent parcels

2. The drawings shall be submitted as a single multi-page pdf file

If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin @tucsonaz.gov or (520) 837-4966
02/09/2021 KEN VAN KARSEN BUILDING-RESIDENTIAL REVIEW Reqs Change T21CM00503
PLAN REVIEW COMMENTS

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions.

SCOPE OF REVIEW:

The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

GENERAL REQUIREMENTS:

The City of Tucson adopted the 2018 IRC with amendments on 1/1/2019. Show the current code reference on the plans.

Consolidate pages of construction plans into a single .PDF file as prescribed at the PDSD web site. https://www.tucsonaz.gov/pdsd/online-permits

FLOOR PLANS:

1. Show the existing sleeping room with R310 compliant egress or show the proposed room as a bedroom extension and removal of separating doors, R301.1.

PLUMBING PLANS:

1. Show plumbing vents (VTR) within acceptable distances from traps, P3105.1.

MECHANICAL PLANS:

1. Provide heating facilities in all habitable rooms, R303.9.

ELECTRICAL PLANS:

1. Show receptacle outlets at wall spaces 2’ or more with no wall point (exclude door openings) more than 6’ from a receptacle outlet, E3901.2.
2. Show a receptacle outlet within 3’ of each lavatory basin in each bathroom, E3901.6. Show Bathroom receptacles on a separate 20 AMP circuit (dedicated) with outlets at no other location, E3703.4 and E3901.6.
3. Show at least one wall switch controlled light or outlet in bathrooms, outdoor entrances or exits and all habitable rooms, E3903.3.

INTERNATIONAL ENERGY CONSERVATION CODE:

1. The simplified prescribed energy values for ceiling R-30 for a qualifying room additions and (dwelling/garage) wall R=13. Show the “R” values of insulation and the maximum “U” factors of the windows and doors on the plans as well as the solar heat gain coefficient SHGC minimum value of 0.25, N1102.1.

If you have any questions, please contact:
Ken Van Karsen
(520) 837-4912
City of Tucson Residential Plan Review
02/23/2021 ANDREW CONNOR NPPO REVIEW Passed