Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: T21CM00360
Parcel: 13608032E

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T21CM00360
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/15/2021 DTRAMME1 ENGINEERING REVIEW Passed
01/26/2021 ROBERT SHERRY WATER REVIEW Completed
01/28/2021 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
02/04/2021 STEVE SHIELDS ZONING REVIEW Approved
02/04/2021 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Provide complete compliance with the 2018 IECC for the lighting.
2. Provide a note on the power plan requiring compliance with NEC 517.13 for the wiring methods.
3. Provide for Tamper Resistant Receptacles per NEC 406.12 where applicable.
Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements.
02/04/2021 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet 3G01.02; Code Review Data (Occupant Load): A note indicates to refer to G02.01 for individual space occupancy loads. It does not appear those occupant loads are indicated on 3G02.01. Please verify.
2. Sheet 3G01.02; Code Review Data: Please indicate the total occupant load per floor on this sheet. In addition, indicate the occupant load and calculations for means of egress required/provided, and the plumbing fixture calculations required/provided.
3. General: Please provide north arrows on all plans.
4. General: Please provide written responses for all review comments.
02/04/2021 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
02/08/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed .
03/04/2021 JPEELDA1 FIRE REVIEW Approved