Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: ROW SWF - SUBMITTAL
Permit Number - T20RW03012
Review Name: ROW SWF - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/28/2020 | JSANDER1 | START | START | Completed | |
05/28/2020 | JSANDER1 | IT_NETWK | REVIEW | Approved | |
06/02/2020 | PROSENB1 | DOT STREET MAINTENANCE | REVIEW | Approv-Cond | Streets irrigation does have landscape and irrigation at this location in the medians. Any damages, rerouting to existing irrigation or planting shall be at the contractor's expense. Paul Rosenboom (520)419-7064 |
06/05/2020 | RLEIGH1 | DOT_WATER | REVIEW | Reqs Change | Revise site power plan to show Tucson Water facilities. There is a 16" water line on the north side of Valencia Rd. Tucson Water Record drawings are available from Tucson Water Mapping Section (520-791-2658) If the power line will be bored across Valencia Rd, it will require that these plans be submitted to Tucson water for approval. |
06/05/2020 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | 1. Revise site power plan to show Tucson Water facilities. There is a 16" water line on the north side of Valencia Rd. Tucson Water Record drawings are available from Tucson Water Mapping Section (520-791-2658) 2. Include a note on plans indicating that there is a pavement cut moratorium in effect until April 14, 2022 on Valencia Rd. 3. If the power line will be bored across Valencia Rd, it will require that these plans be submitted to Tucson water for approval. 4. Submit a temporary traffic control plan for powerline work. 5 Include the following standard notes. City of Tucson DTM Standard notes 1. Contractor shall maintain site safety and pedestrian access through or around the work site pursuant to MUTCD requirements. For work located on major or collector roadways (>25MPH), pedestrian circulation shall be provided through or around the work site and NOT detoured to the other side of the street. 2. Barricade plan is subject to change as determined by the COT, Department of Transportation and Mobility construction inspector. Plan revisions must be documented. 3. Contractor shall repair all disturbed landscaping. This includes irrigation, plantings, groundcover, and hardscape. Irrigation lines under driveways must be in sleeves. 4. All concrete (sidewalk, curbing, driveways or curb access ramps) damaged or removed shall be replaced as whole or to the nearest joint. 5. Contractor shall practice stormwater good housekeeping measures during construction. 6. Contractor shall notify adjacent residences/businesses of proposed construction activities one week prior to start of construction. 7. A preconstruction meeting shall be held with the COT, Department of Transportation and Mobility construction and electrical Inspectors. |
06/08/2020 | JSANDER1 | DOT_ELEC | REVIEW | Approved | |
06/08/2020 | JSANDER1 | REAL_ESTATE | REVIEW | Needs Review | |
07/01/2020 | JSANDER1 | HISTORIC | Review | Approved |