Permit Review Detail
Review Status: Completed
Review Details: ROW SWF - SUBMITTAL
Permit Number - T20RW02201
Review Name: ROW SWF - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/08/2020 | JSANDER1 | START | START | Completed | |
06/08/2020 | JSANDER1 | HISTORIC | Review | Review Comp | |
06/09/2020 | PROSENB1 | DOT STREET MAINTENANCE | REVIEW | Approved | Streets irrigation does not have any comments or concerns for this location at this time. Paul Rosenboom |
06/10/2020 | JSANDER1 | IT_NETWK | REVIEW | Approved | |
06/16/2020 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | 1. Revise drawing to locate small cell pole, power meter and vaults future outside the future sidewalk and curb access ramp areas. The proposed small cell facilities must be located a minimum of 6' from the back of curb and 7' along the curb radii. 2. Add the following TDOT&M standard notes. City of Tucson DOT&M Standard Notes a. Contractor shall maintain site safety and pedestrian access through or around the work site pursuant to MUTCD requirements. For work located on major or collector roadways (>25MPH), pedestrian circulation shall be provided through or around the work site and NOT detoured to the other side of the street. b. Barricade plan is subject to change as determined by the COT, Department of Transportation and Mobility construction inspector. Plan revisions must be documented. c. Contractor shall repair all disturbed landscaping. This includes irrigation, plantings, groundcover, and hardscape. Irrigation lines under driveways must be in sleeves. d. All concrete (sidewalk, curbing, driveways or curb access ramps) damaged or removed shall be replaced as whole or to the nearest joint. e. Contractor shall practice stormwater good housekeeping measures during construction. f. Contractor shall notify adjacent residences/businesses of proposed construction activities one week prior to start of construction. g. A preconstruction meeting shall be held with the COT, Department of Transportation and Mobility construction and electrical Inspectors. |
06/16/2020 | RLEIGH1 | DOT_WATER | REVIEW | Reqs Change | |
06/18/2020 | JSANDER1 | DOT_ELEC | REVIEW | Approved | |
06/18/2020 | JSANDER1 | REAL_ESTATE | REVIEW | Needs Review |