Permit Number: T20RW02020
Parcel: 999999999

Review Status: Completed

Review Details: ROW SWF - SUBMITTAL

Permit Number - T20RW02020
Review Name: ROW SWF - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/03/2020 JSANDER1 START START Completed
06/03/2020 JSANDER1 HISTORIC Review Approved
06/04/2020 JSANDER1 IT_NETWK REVIEW Approved
06/04/2020 PROSENB1 DOT STREET MAINTENANCE REVIEW Approved Streets irrigation does not have any comments or concerns for this location at this time. Paul Rosenboom
06/05/2020 RLEIGH1 DOT_WATER REVIEW Approved
06/05/2020 RICHARD LEIGH DOT ENGINEERING REVIEW Reqs Change 1. Revise drawing to locate pole and power meter outside future pedestrian facilities area. The pole needs to be located a minimum of 7 feet from back of curb to allow construction of a curb access ramp and the power meter needs to be located a minimum 6' from back of curb.

2. Depict existing driveway adjacent to proposed cell site. The pole must be a minimum of 5' from start of driveway depression.

3. Add the following standard notes.

City of Tucson DTM Standard notes

1. Contractor shall maintain site safety and pedestrian access through or around the work site pursuant to MUTCD requirements. For work located on major or collector roadways (>25MPH), pedestrian circulation shall be provided through or around the work site and NOT detoured to the other side of the street.

2. Barricade plan is subject to change as determined by the COT, Department of Transportation and Mobility construction inspector. Plan revisions must be documented.

3. Contractor shall repair all disturbed landscaping. This includes irrigation, plantings, groundcover, and hardscape. Irrigation lines under driveways must be in sleeves.

4. All concrete (sidewalk, curbing, driveways or curb access ramps) damaged or removed shall be replaced as whole or to the nearest joint.

5. Contractor shall practice stormwater good housekeeping measures during construction.

6. Contractor shall notify adjacent residences/businesses of proposed construction activities one week prior to start of construction.

7. A preconstruction meeting shall be held with the COT, Department of Transportation and Mobility construction and electrical Inspectors.
06/16/2020 JSANDER1 DOT_ELEC REVIEW Approved
06/17/2020 JSANDER1 REAL_ESTATE REVIEW Needs Review