Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION LABELS
Plan Number - T20PRE0192
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/04/2021 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements. |
01/06/2021 | MROSS2 | COT NON-DSD | FIRE | Completed | None |
01/11/2021 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Completed | Access to and from 9th Street will not be supported. Commercial traffic on residential street not supported. Access from Speedway acceptable if access managment standards are met. |
01/13/2021 | SBLOOD1 | ENGINEERING | REVIEW | Completed | 1.Show a continuous pedestrian circulation path for the development as per TSM 7-01.3.3. 2. Show the solid waste collection maneuverability with dimensions to ensure adequate space to pull in and back out. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
01/13/2021 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | 300 - 330 pm - T20PRE0192 - 27 W SPEEDWAY BL - Speedway Blvd. Carwash 1. Two existing ¾" copper water service lines and one 1" copper service lines connect this combined property to the existing 8" cement asbestos (CA) water main in Speedway Blvd. (PN 162-1984). And, a third existing ¾" copper water service line connects this combined property to the existing 8" cement asbestos (CA) water main in 9th Avenue. 2. Should these existing water service lines be too small to serve the proposed car wash, please contact Tucson Water's New Services section by sending an e-mail to TW_COMMON@tucsonaz.gov to discuss: o Acceptable new points of connection to Tucson Water's existing water mains. Please note: No new connections will be allowed to the 16" concrete cylinder water transmission main in Estrella Avenue. o The number of water service lines, water meters, and meter sizes, necessary to serve this development. o The advantages and disadvantages of installing the necessary water meter(s) / water line extension(s) via Tucson Water's Job Order Contract (JOC) process. Please note that if hydraulic modeling is determined to be necessary, it can be done within this process. 3. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 310 W. Alameda St. P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 |
01/14/2021 | LSHAMIS1 | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Loran Shamis; Planner PROJECT: Thursday Pre-submittal meeting – T20PRE0192 Address: 27 W Speedway Blvd. Parcel(s): 11702136A, 11702136B, 11702137A, 11702138B, 11702134B, 11702143B, 11702142C, 117021410 Zoning: R-2, C-3 Existing Use: Vacant Proposed Use: Automotive – minor service and repairs TRANSMITTAL DATE: January 12, 2021 COMMENTS: Development must comply with the Administrative Manual Section 2-06 - Development Package. The proposed use is automotive minor service and repair which is permitted in the C-3 zone but is not permitted in the R-2 zone. Development package cannot include a public right of way – Will need two separate DPs. Setback requirements: -North: MS&R developing street (ADT of 1,000+): 21’ or the height of the exterior wall measured from the back of existing curb or future curb location. -South: Non-res adjacent to non-res: 0’ -East and West and parcels along Ash Ave: MS&R developing area (ADT over 140 but less than 1,000 ): 21’ or the height as measured from the outside edge of adjacent travel lane. Pedestrian circulation path that is ADA compliant is required to connect developed areas and to the street frontage. Parking requirements – automotive washing full-service – 1 space per 500 square feet GFA, including service bays, wash tunnels, office, and retail areas. Two short-term bicycle parking spaces and two long-term bicycle spaces are required, The minimum stacking requirements for full-services automotive washing is four vehicle spaces. Lot combination processed by Pima County is required. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at loran.shamis@tucsonaz.gov or (520) 837-2242. |