Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION LABELS
Plan Number - T20PRE0163
Review Name: PREAPPLICATION LABELS
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/10/2020 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | Part of the site is within El Paso and Southwestern Greenway. https://www.tucsonaz.gov/parks/ElPasoSouthwesternGreenway If applicable: Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements. |
| 11/12/2020 | GDAURIA1 | COT NON-DSD | FIRE | Completed | |
| 11/17/2020 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Completed | No adverse comments. Standard requirements will apply. ADOT should review access along frontage road. |
| 11/19/2020 | ELISA HAMBLIN | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Elisa Hamblin, AICP; Principal Planner PROJECT: Thursday Pre-submittal meeting – T20PRE0163 Address: 2 N Freeway Parcel(s): 116-19-201C, 116-19-205E, 116-20-022H Zoning: C-3 and I-1 Existing Use: Retail – General Merchandise Sales Proposed Use: Retail – General Merchandise Sales TRANSMITTAL DATE: November 19, 2020 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. The proposed use is to expand an existing fuel service station and convenience store. General Merchandise Sales is a permitted use in the C-3 and I-1 zone, subject to use-specific standards 4.9.9.B.1 and 4.9.13.Q. 3. Development standards such as parking and setbacks appear to be met. Maneuverability of parking near Congress St entrance will need to be reviewed closely. Conflict with incoming traffic is a concern. 4. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at elisa.hamblin@tucsonaz.gov. |
| 11/19/2020 | SBLOOD1 | ENGINEERING | REVIEW | Completed | 1. Show landscape areas and maximize water harvesting. Stephen Blood stephen.blood@tucsonaz.gov |
| 11/24/2020 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Needs Review |