Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T20PRE0143
Parcel: Unknown

Address:
613 E DELANO ST

Review Status: Completed

Review Details: PREAPPLICATION LABELS

Plan Number - T20PRE0143
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/19/2020 ANDREW CONNOR LANDSCAPE REVIEW Completed Ensure that Zoning comments are addressed prior to landscape section approval.



Additional comments may apply
10/21/2020 GDAURIA1 COT NON-DSD FIRE Completed
10/26/2020 ZELIN CANCHOLA COT NON-DSD TRAFFIC Completed Standard requirements will apply.

The open area with concrete curb keynote 7 will require change. It is in the pedestrian path.
10/28/2020 ELISA HAMBLIN ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Elisa Hamblin, AICP; Principal Planner

PROJECT: Thursday Pre-submittal meeting – T20PRE0143
Address: 613 E Delano St
Parcel(s): 10711014A
Zoning: C-2
Existing Use: Civic – Education, Instructional School
Proposed Use: TBD

TRANSMITTAL DATE: October 28, 2020

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. The proposal is for conversion of an existing building from a dance studio to commercial kitchen space. Additional information is needed to determine the exact use of the proposed business. Typically, commercial kitchens, which may sell food to vendors, would be considered “Wholesaling – Food and Beverage Wholesaling”. This use is permitted in the C-2 zone, subject to 4.9.13.P.
3. The conversion to the kitchen use is not considered a change of use per zoning code regulations. As such, the only site development standards that will be triggered are those initiated by the applicant.
4. If the proposal for the parking area is to simply “re-stripe” parking spaces in their prior configuration, improvements are not required. If parking spaces are “reconfigured”, landscaping and other development standards may apply.
5. Any improvements to ADA parking spaces, access ramps etc. can be processed on a tenant improvement building plan set and may not require a development package (site plan) review.
6. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at elisa.hamblin@tucsonaz.gov.
10/28/2020 SBLOOD1 ENGINEERING REVIEW Completed 1) Provide on plans waste stream calculations per City of Tucson (COT) Technical Standards Manual (TSM) section 8-01.8.0

2) Show on plans proposed trash enclosure mentioned in scope of work

3) Provide a barrier along east side of property to keep vehicles from crossing into neighboring parcel

Stephen Blood
Stephen.blood@tucsonaz.gov
10/29/2020 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Completed 200 - 230 pm - T20PRE0143 - 613 E DELANO ST - SiteGrading 613 E. Delano Street

Currently the property is served by a 1 ½" service line.

Tucson Water has no adverse comments regarding this proposed development.

Any questions, comments or concerns about these projects may be directed to:

Fabien Elenes, Engineering Associate
Tucson Water, New Development Section
310 W. Alameda St.
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2202
Fabien.Elenes@tucsonaz.gov