Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T20PRE0140
Parcel: Unknown

Review Status: Completed

Review Details: PREAPPLICATION LABELS

Plan Number - T20PRE0140
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/19/2020 ANDREW CONNOR LANDSCAPE REVIEW Completed Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements.
10/21/2020 ZELIN CANCHOLA COT NON-DSD TRAFFIC Completed No adverse comments. Standard requirements will apply.
10/21/2020 ELISA HAMBLIN ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Elisa Hamblin, AICP; Principal Planner

PROJECT: Thursday Pre-submittal meeting – T20PRE0140
Address: 7505 and 7507 E Broadway Bl
Parcel(s): 13323110K
Zoning: C-1
Existing Use: Vacant
Proposed Use: Food Service

TRANSMITTAL DATE: October 21, 2020

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. The proposed use of Food Service is permitted in the C-1 zone, subject to use-specific standards 4.9.4.M.1 & 5 and 4.9.13.O.
3. It appears this site will function in tandem with the existing shopping center as parking spaces and circulation will be shared. If shared parking or off-site parking is planned, provide adequate documentation with DP submittal.
4. Broadway Bl is a Major Street and Route. Street setback is 21 ft or the wall height, whichever is greater, as measured from the back of future curb.
5. Bike parking is required. Two long-term and two short-term spaces are required.
6. The DP will need to include a reference sheet illustrating the entire site (including the existing shopping center) and an expansion calculation.
7. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at elisa.hamblin@tucsonaz.gov.
10/21/2020 GDAURIA1 COT NON-DSD FIRE Completed
10/22/2020 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Completed 230 - 300 pm - T20PRE0140 - Site Black Rock Coffee - E. Broadway

1. Tucson Water has no adverse comments regarding this proposed development.
2. Any questions, comments or concerns about these projects may be directed to:
Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
310 W. Alameda St.
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
10/22/2020 SBLOOD1 ENGINEERING REVIEW Completed 1. Show complete pedestrian circulation

2. Show cross-access easements with adjacent developments

3. The project is within 500 feet of a landfill so the methane self-certification review is required

Stephen Blood
stephen.blood@tucsonaz.gov