Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION
Plan Number - T20PRE0133
Review Name: PREAPPLICATION
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/06/2020 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements. |
| 10/07/2020 | SBLOOD1 | ENGINEERING | REVIEW | Completed | 1. Show solid waste collection vehicle maneuverability. 2. Maximize water harvesting. Stephen Blood stephen.blood@tucsonaz.gov |
| 10/08/2020 | GDAURIA1 | COT NON-DSD | TRAFFIC | Completed | No adverse comments from Transportation and Mobility. Standard requirements will apply. Zelin Canchola |
| 10/14/2020 | ELISA HAMBLIN | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Elisa Hamblin, AICP; Principal Planner PROJECT: Thursday Pre-submittal meeting – T20PRE0133 Address: 263 W Glenn St Parcel(s): 107-13-0800 Zoning: R-3 Existing Use: Vacant Proposed Use: Residential – Multifamily Development TRANSMITTAL DATE: October 14, 2020 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. The proposed Multifamily Development use is permitted in the R-3 zone, subject to use-specific standards 4.9.7.B.6. 3. Development standards such as height, density and parking appear to be met. 4. Setback requirements appear to be generally met, however please note and correct the following as needed: a. North (Glenn St): 21 ft or the wall height, whichever is greater, as measured from back of future curb b. South (Balboa Av): 21 ft or the wall height, whichever is greater, as measured from the outside edge of adjacent travel lane. c. East and South: 10 ft or ¾ the wall height, whichever is greater 5. Lot coverage is limited to 70%. 6. Bike parking is required. Two -short-term and eight long-term bike parking spaces would be required based on the proposed bedroom count. 7. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at elisa.hamblin@tucsonaz.gov. |
| 10/15/2020 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | 200 - 230 pm - T20PRE0133 - Site Glenn at Balboa Housing Dev 1. Tucson Water has no adverse comments regarding this proposed project. 2. Any questions, comments or concerns about these projects may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 310 W. Alameda St. P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |
| 10/16/2020 | SBEASLE1 | COT NON-DSD | FIRE | Completed | * Fire sprinklers required |