Review Status: Completed
Review Details: PREAPPLICATION
Plan Number - T20PRE0132
Review Name: PREAPPLICATION
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/06/2020 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements. |
| 10/07/2020 | SBLOOD1 | ENGINEERING | REVIEW | Completed | 1. Balanced basin detention required: no increase for peak discharge for 2, 10, and 100-yr events. 2. 5-yr threshold retention is required. 3. ADC-3, NCZ-A requirements apply per UDC section 5.6 4. Maximize water harvesting. 5. FUP will be required. 6. No unnecessary disturbances of riparian areas. Stephen Blood stephen.blood@tucsonaz.gov |
| 10/08/2020 | GDAURIA1 | COT NON-DSD | FIRE | Completed | * |
| 10/12/2020 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Completed | No adverse comments. Standard requirements will apply. |
| 10/14/2020 | ELISA HAMBLIN | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Elisa Hamblin, AICP; Principal Planner PROJECT: Thursday Pre-submittal meeting – T20PRE0132 Address: 9538 E Old Vail Rd Parcel(s): 141-18-5250, -5260, -5270, -5280, -5290, -530B & -530C Zoning: I-2 Existing Use: Industrial – General Manufacturing Proposed Use: (same) TRANSMITTAL DATE: October 14, 2020 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. The proposed expansion of the existing General Manufacturing use is permitted in the I-2 zone, subject to use-specific standards 4.9.5.C and 4.9.13.Q. 3. The site is located within the Airport Environs Zone - Davis-Monthan Air Force Base Environs. This site is specifically regulated by the Approach-Departure Corridor 3 and Noise Control Zone A. The proposal appears to meet the standards of the overlay zoning. 4. Development standards such as height, setbacks and parking appear to be met. 5. Long-term bicycle parking is required at the ratio of 1 space per 15,000 sq ft of GFA. 6. As the proposal includes an expansion of more than 25%, the entire site will be required to meet current development standards. 7. Pedestrian access and circulation is required from adjacent streets and within the development. 8. A lot combination to be processed by Pima County is required. 9. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at elisa.hamblin@tucsonaz.gov. |
| 10/15/2020 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | 130 - 200 pm - T20PRE0132 - SiteGradingSWPPP TuSimple expansion 1. Tucson Water has no adverse comments regarding this proposed project. 2. Any questions, comments or concerns about these projects may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 310 W. Alameda St. P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |