Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION LABELS
Plan Number - T20PRE0122
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/16/2020 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements. |
09/21/2020 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Reqs Change | No adverse comments. Standard requirements will apply. |
09/24/2020 | ELISA HAMBLIN | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Nicholas Martell; Planner PROJECT: Thursday Pre-submittal meeting – T20PRE0122 Address: 1121 S 11th Av Parcel(s): 117091080 Zoning: C-3 Existing Use: Vacant Proposed Use: Multifamily Development TRANSMITTAL DATE: September 24, 2020 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. The proposed use is Multifamily Development, which is permitted in the C-3 zone. 3. Development standards such as setbacks and height appear to be met. 4. Provide square footage of all units in order to determine parking requirements. Provided parking appears adequate if the proposed units are less than 400 square feet. 5. Provide required bike parking on site. With 20 units, a total of 2 short-term and 10 long-term spaces are required. 6. Provide accessible parking on site. 7. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at nicholas.martell@tucsonaz.gov or (520) 837-4966. |
09/24/2020 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Reqs Change | 300 - 330 pm - T20PRE0122 - 1121 S 11TH AV - SiteGradingDDOPDMR 11th Ave. Development - There is an 12" Ci water line (PN 165-1997) is in 11th Av. There is a 6" Fire Hydrant near the Northwest corner of the property. 3/4" meter on a 1" service line serving the property currently. - To further discuss options for obtaining water service further, please contact Mr. Ray Munoz or Mr. Jeremiah Jenkins at 837-2207 in the Tucson Water New Services Section to discuss: o Potential points of connection for the waterline extension to Tucson Water's existing water distribution system. o The number of water service lines, water meters, and meter sizes, necessary to serve this development. o The advantages and disadvantages of installing the necessary water meters via Tucson Water's Job Order Contract (JOC) process. o Please note that if hydraulic modeling is necessary to verify which potential points of connection have the capacity necessary to serve the proposed development, it can be done as part of Tucson Water's Job Order Contract (JOC) process. All questions, comments or concerns about these comments may be addressed to: Fabien Elenes, Engineering Associate Tucson Water, New Development Section 310 W. Alameda St. P.O. Box 27210, Tucson, AZ 85726-7210 (520) 837-2202, Fabien.Elenes@tucsonaz.gov |
09/24/2020 | LOREN MAKUS | ENGINEERING | REVIEW | Completed | 1. This is not in a balanced or critical basin. Retention and detention are not required. 2. Show access to the solid waste enclosures. 3. Maximize water harvesting. 4. Back-up spur required. |
09/29/2020 | SBEASLE1 | COT NON-DSD | FIRE | Needs Review | * Aerial access required. Not feasable with current layout. |