Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T20PRE0119
Parcel: Unknown

Address:
2501 E ELM ST

Review Status: Completed

Review Details: PREAPPLICATION

Plan Number - T20PRE0119
Review Name: PREAPPLICATION
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/15/2020 ANDREW CONNOR LANDSCAPE REVIEW Completed 8.7.3. FLEXIBLE LOT DEVELOPMENT (FLD)

Landscaping, Screening and Wall Requirements

1. FLD projects shall comply with Section 7.6, Landscaping and Screening Standards, except as otherwise provided by this section.

2. One canopy tree shall be provided every 40 feet of pedestrian circulation systems, excluding crossings with streets, alleys, and driveways. If providing canopy trees every 40 feet is not achievable, the applicant shall:

a. Provide the equivalent number of trees that would be obtained using the 40-foot increment measure; and,

b. Distribute the trees within the FLD project site along pedestrian circulation systems and within functional open space areas.

3. Landscape plans shall incorporate water-conserving design as defined in Section 7.6.6, Use of Water, and as described in the Technical Standards Manual.

4. Water harvesting techniques shall be incorporated as part of the landscape design based on the Water Harvesting Guidance Manual prepared for the City of Tucson Transportation Department Stormwater Section.

5. Mechanical equipment, utility boxes, irrigation equipment and similar elements shall be screened from adjacent streets exterior to the project and from adjacent existing residential development. Screening shall be architecturally integrated with the overall design of the FLD.

6. If a perimeter wall is proposed along an existing public right-of-way, it shall be constructed of, or painted with, graffiti-resistant materials. The wall shall incorporate one or more of the following decorative materials:

a. Tile;

b. Stone;

c. Brick;

d. Adobe;

e. A textured material such as stucco or plaster; or,

f. Metal.
09/17/2020 LOREN MAKUS ENGINEERING REVIEW Completed 1. Adjacent to Wilson Avenue Wash Floodplain. Buildings will need to be elevated about BFE.
2. Not balanced or critical.
3. Maximize water harvesting.
4. Elm is an MS&R collector. Solid waste collection must be from on the site.
09/21/2020 ZELIN CANCHOLA COT NON-DSD TRAFFIC Reqs Change Further discussion and reconfiguration of drive access. Proposed driveway is too close to signalized intersection and is in conflict with the west bound left turn lane. Access off of Tucson Blvd shall be explored.
09/24/2020 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Reqs Change 230 - 300 pm - T20PRE0119 - 2501 E ELM ST - Site FLD Elm Fit Out

- There is an 8" CA water line (PN 013-1961) is in Elm St. & a 8" CI water line (PN 001-1950) in Tucson Bl. There is a 4" Fire Service near the Southeast corner of the property. 5/8" meter on a 1" service line serving the property currently.

- No required fire flow was shown on the documents provided by the Applicant. Please be aware that the amount of fire flow required by the fire department may necessitate off-site improvements to the public water distribution system in this area.

- To further discuss options for obtaining water service further, please contact Mr. Ray Munoz or Mr. Jeremiah Jenkins at 837-2207 in the Tucson Water New Services Section to discuss:
o Potential points of connection for the waterline extension to Tucson Water's existing water distribution system.
o The number of water service lines, water meters, and meter sizes, necessary to serve this development.
o The advantages and disadvantages of installing the necessary water meters via Tucson Water's Job Order Contract (JOC) process.
o Please note that if hydraulic modeling is necessary to verify which potential points of connection have the capacity necessary to serve the proposed development, it can be done as part of Tucson Water's Job Order Contract (JOC) process.

All questions, comments or concerns about these comments may be addressed to:
Fabien Elenes, Engineering Associate
Tucson Water, New Development Section
310 W. Alameda St.
P.O. Box 27210, Tucson, AZ 85726-7210
(520) 837-2202, Fabien.Elenes@tucsonaz.gov
09/24/2020 GDAURIA1 COT NON-DSD FIRE Reqs Change * Sprinklers required
* Buildings over 30' in height requires aerial ladder access 26' wide set 15- 30' fron buildings.
* Regular fire access must extend to within 200' of any exterior portion of the building
* If height less than 30', fire access not to exceed 150' without a turnarond* Access from Tucson Blvd required.
09/24/2020 ELISA HAMBLIN ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Elisa Hamblin, AICP; Principal Planner
PROJECT: Thursday Pre-submittal meeting – T20PRE0119
Address: 2501 E Elm St
Parcel(s): 11700402560
Zoning: C-1, R-2
Existing Use: Administrative and Professional Office
Proposed Use: Flexible Lot Development

TRANSMITTAL DATE: September 24, 2020

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. The proposed use is Flexible Lot Development, which is permitted in the R-2 and C-1 zones, subject to use-specific standards 8.7.3.
3. When a site is split by two different zones, the site may be developed in a unified manner, but the development standards for each must still be met. The proposed density of 30 units per acre does not meet the R-2 maximum density of 22 units per acre as permitted under the FLD Maximum Density Option.
4. The proposed building height exceeds the allowable height in the C-1 and R-2 zones. Height is limited to 25 ft. The FLD option does not modify this standard. A rezoning would likely be necessary to build to 36 ft.
5. The proposed buildings do not meet required setbacks on all sides of the development.
a. R-2: North (nonresidential use to residential zone) requires 10 ft or ¾ the wall height. Minimum required is 27 ft. Proposed is 6 ft.
b. R-2: East (nonresidential use to residential zone) requires 10 ft or ¾ the wall height. Minimum required is 27 ft. Proposed is 23 ft.
c. C-2: East (nonresidential use to residential zone) requires 1.5 times the wall height. Minimum required is 54 ft. Proposed is 23 ft.
d. South and West (street setback on Elm and Tucson) requires 21 ft or the wall height, as measured from the back of future curb. Minimum requirement is 36 ft. Proposed is unknown (need measurement from future curb).
6. Please note, setbacks cannot be modified by a Design Development Option (DDO) when developing an FLD or when adjacent to a Major Street and Route.
7. Provide additional information regarding site coverage standards. In an FLD, site coverage vs. lot coverage is used. See UDC Article 6.4.3. Maximum site coverage is 75%. Standards appear to be met, but additional information is needed.
8. Provide additional information with Development Package submittal regarding how the appropriate criteria for the Green Building standards related to the Maximum Density Option are being met.
9. Provide functional open calculation and indicate on the site plan with Development Package submittal. Minimum requirement is 161 sq ft / unit when building at more than 13 units/acre.
10. Parking and bike parking standards appear to be met.
11. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.
If you have any questions, please contact me at elisa.hamblin@tucsonaz.gov.