Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION
Plan Number - T20PRE0088
Review Name: PREAPPLICATION
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/21/2020 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | No comments at this time expansion is less than 25%. |
| 07/24/2020 | LOREN MAKUS | ENGINEERING | REVIEW | Completed | 1. Closing the existing driveway would be preferred. 2.Maximize water harvesting. |
| 08/03/2020 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Completed | No adverse comments. Stanard requirements will apply. Zelin Canchola Transportation and Mobility Engineering |
| 08/04/2020 | ELISA HAMBLIN | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Elisa Hamblin, AICP; Principal Planner PROJECT: Thursday Pre-submittal meeting – T20PRE0088 Address: 1501 W Sant Mary’s Rd Parcel(s): 116-15-077C Zoning: C-1 Existing Use: Commercial – Food Service Proposed Use: Commercial – Food Service TRANSMITTAL DATE: August 4, 2020 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. The proposal is for the demolition of an existing food service building and construction of a new food service building. The use is permitted in the C-1 zone, subject to use-specific standards 4.9.4.M.1 & 5 and 4.9.13.O. 3. Two site plans were submitted for review. On the 2,200 sq ft version – construction of a new building requires current development standards are met. The 23 ft PAAL on the west side does not meet standards. 4. Pedestrian access (sidewalk, crosswalk) is required from Saint Mary’s to the building. Pedestrian circulation is also required within the site. 5. Parking spaces appear adequate for either proposal, based on the square footage and parking space count provided by the applicant. Setbacks and building height also appear adequate. 6. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at elisa.hamblin@tucsonaz.gov or (520) 837-4966. |
| 08/06/2020 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | 130 - 200 pm - T20PRE0088 - 1501 W SAINT MARYS RD - SITE - New shell bldg, Coffee Place Tucson Water has no adverse comments about either option. Should a new water service line be needed for this project, it will need to be connected to the existing 8-inch distribution line in the traffic lanes of St. Mary’s Rd, rather than to the closer 24-inch transmission main at the edge of pavement. Tim Rowe, Sr. Engineering Associate Tucson Water, New Development Section 310 W. Alameda St. P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 |
| 08/06/2020 | GDAURIA1 | COT NON-DSD | FIRE | Completed |