Plan Number: T20PRE0088
Parcel: Unknown

Review Status: Completed

Review Details: PREAPPLICATION

Plan Number - T20PRE0088
Review Name: PREAPPLICATION
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/21/2020 ANDREW CONNOR LANDSCAPE REVIEW Completed No comments at this time expansion is less than 25%.
07/24/2020 LOREN MAKUS ENGINEERING REVIEW Completed 1. Closing the existing driveway would be preferred.
2.Maximize water harvesting.
08/03/2020 ZELIN CANCHOLA COT NON-DSD TRAFFIC Completed No adverse comments. Stanard requirements will apply.

Zelin Canchola
Transportation and Mobility Engineering
08/04/2020 ELISA HAMBLIN ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Elisa Hamblin, AICP; Principal Planner

PROJECT: Thursday Pre-submittal meeting – T20PRE0088
Address: 1501 W Sant Mary’s Rd
Parcel(s): 116-15-077C
Zoning: C-1
Existing Use: Commercial – Food Service
Proposed Use: Commercial – Food Service

TRANSMITTAL DATE: August 4, 2020

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. The proposal is for the demolition of an existing food service building and construction of a new food service building. The use is permitted in the C-1 zone, subject to use-specific standards 4.9.4.M.1 & 5 and 4.9.13.O.
3. Two site plans were submitted for review. On the 2,200 sq ft version – construction of a new building requires current development standards are met. The 23 ft PAAL on the west side does not meet standards.
4. Pedestrian access (sidewalk, crosswalk) is required from Saint Mary’s to the building. Pedestrian circulation is also required within the site.
5. Parking spaces appear adequate for either proposal, based on the square footage and parking space count provided by the applicant. Setbacks and building height also appear adequate.
6. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at elisa.hamblin@tucsonaz.gov or (520) 837-4966.
08/06/2020 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Completed 130 - 200 pm - T20PRE0088 - 1501 W SAINT MARYS RD - SITE - New shell bldg, Coffee Place

Tucson Water has no adverse comments about either option.
Should a new water service line be needed for this project, it will need to be connected to the existing 8-inch distribution line in the traffic lanes of St. Mary’s Rd, rather than to the closer 24-inch transmission main at the edge of pavement.

Tim Rowe, Sr. Engineering Associate
Tucson Water, New Development Section
310 W. Alameda St.
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
08/06/2020 GDAURIA1 COT NON-DSD FIRE Completed