Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T20PRE0086
Parcel: Unknown

Review Status: Completed

Review Details: PREAPPLICATION

Plan Number - T20PRE0086
Review Name: PREAPPLICATION
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/17/2020 LOREN MAKUS ENGINEERING REVIEW Completed Follow rezoning conditions.
07/20/2020 ANDREW CONNOR LANDSCAPE REVIEW Completed Residential Subdivisions
Street landscape borders for residential subdivisions of eight or more lots shall conform to the following standards.
(1) Street landscape borders are only required along the exterior boundaries of subdivisions. Landscape borders are not required along front yard street frontages.
(2) Walls, fences, or other screening must be placed behind the landscape border.
(3) The landscape border must be recorded as common area and maintained by the homeowners association (HOA) for the subdivision. The subdivision CC&Rs shall reference and require compliance with the maintenance standards in Section 7.6.8, Maintenance. The PDSD Director may allow the recording of a public use easement with the subdivision plat in cases where the standards of this section are the only reason for the creation of an HOA. The public use easement shall require the abutting property owner to install and maintain a landscape border in accordance with the standards in this section.
(4) Street landscape borders fronting on local streets may be reduced to a minimum of five feet.

Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements.
07/21/2020 GDAURIA1 COT NON-DSD FIRE Completed * New hydrants to be installed throughout per TFD Guidelines
07/27/2020 ZELIN CANCHOLA COT NON-DSD TRAFFIC Completed The following improvements in the right of way are required: (show on plan)

1. Extention of the Houghton Road Greenway path along the projects frontage.

2. East bound left turn lane along Broadway to Broadway entrance.

3. Turn lanes to Entrance along Houghton Road.

4. Traffic Impact analysis according to the City of Tucson's Access Management Gudelines.

5. A Private Improvement Agreements (PIA) will be required for work in the right of way.
07/30/2020 ELISA HAMBLIN ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Elisa Hamblin, AICP; Principal Planner

PROJECT: Thursday Pre-submittal meeting – T20PRE0086
Address: 520 N Houghton Rd
Parcel(s): 133-37-017G & 133-37-017H
Zoning: R-1 (authorized)
Existing Use: Vacant
Proposed Use: Flexible Lot Development

TRANSMITTAL DATE: July 30, 2020

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. The proposed use of Flexible Lot Development is permitted in the R-1 zone, subject to use-specific standards 8.7.3.
3. The proposal appears to meet the standards for an FLD. Complete review of the FLD standards and compliance with the rezoning conditions will be completed with the Development Package review.
4. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at elisa.hamblin@tucsonaz.gov or (520) 837-4966.
07/31/2020 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Completed 200 - 230 pm - T20PRE0086 - 520 N HOUGHTON RD - Minor Subd Houghton Reserve
1. This property lies just within the ‘D’ pressure zone, on the boundary between the ‘D’ pressure
zone to the north and northwest, and ‘E’ pressure zone on the east, south and southwest.
2. If the fire flow requirements for the commercial parcel on the south side of the property are
large, a connection to the existing 12” “E” zone water main in Broadway may be necessary.
3. The on-site water mains (and any necessary off-site water mains) that will be constructed to
serve this property will need to be looped to the maximum extent practicable.
4. The design for the water mains that will serve this property will need to go through Tucson
Water’s Master Water Plan and Design Plan processes.
5. The private streets and other common areas of this proposed subdivision will need to be
dedicated as utility easements.

Tim Rowe, Sr. Engineering Associate
Tucson Water, New Development Section