Plan Number: T20PRE0013
Parcel: Unknown

Address:
3250 N STONE AV

Review Status: Completed

Review Details: PRESUBMITTAL MTG

Plan Number - T20PRE0013
Review Name: PRESUBMITTAL MTG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/22/2020 ANDREW CONNOR LANDSCAPE REVIEW Completed Vehicular Use Areas

The standards in this Section 7.6.4.B apply to all developments that provide more than four motor vehicle parking spaces, except as provided in Section 7.6.4.B.1.c,

No landscape comments at this time.
01/22/2020 ZELIN CANCHOLA COT NON-DSD TRAFFIC Completed * If built under th IBC; all R's require fire sprinklers.
01/22/2020 ZELIN CANCHOLA COT NON-DSD TRAFFIC Completed January 22, 2020
T20PRE0013
Zelin Canchola Transportation

No adverse comments. Standard requirements will apply.
01/28/2020 LOREN MAKUS ENGINEERING REVIEW Completed T20PRE0013 - 3250 N Stone Av
Lot reconfiguration and lot division
1. Entire property is within FEMA special flood hazard area zone AE.
2. Encroachment analysis must be completed by a registered professional engineer.
3. Changing property line to chain link fence is lot line reconfiguration, a simple process.
4. Dividing parcel into two or more will require a subdivision with tentative and final plat.
5. Parking grade must be within 1 foot of base flood elevation.
01/29/2020 ELISA HAMBLIN ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Elisa Hamblin, AICP; Principal Planner

PROJECT: Thursday Pre-submittal meeting - T20PRE0013
Address: 3250 N Stone Av
Parcel(s): 10603054B, 10603054A
Zoning: R-3
Existing Use: Vacant
Proposed Use: Duplex development (Subdivision required)

TRANSMITTAL DATE: January 29, 2020

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. Sawtelle Place Lot 1 Blk 4 was split into two parcels in 1983. The parcel in question is one of those two parcels. In order to achieve the request as outlined, you must follow two steps: 1) process a lot line reconfiguration to add the land to the east and south back into this parcel, then 2) apply for a subdivision to create two new parcels.
3. Alternately, you could process a subdivision for this parcel and the neighboring parcel at the same time in order to make all the property line adjustments as illustrated.
4. Please note, this site is not eligible for a minor subdivision and must be processed in a two-step process (tentative and final plat).
5. Any existing structures on the developed site need to meet required setbacks with the new property lines. If setbacks cannot be met, a Design Development Option (DDO) can be requested to allow for reduced setbacks.
6. Please note, two parcels are not required to develop two duplexes (4 units) on this site. You could also develop on the existing single parcel as a multifamily development.
7. As Stone Av is a designated Major Street & Route, the setback from Stone is 21 ft or the wall height, as measured from the back of future curb. Setbacks on the other sides of the property appear to be met.
8. Duplex is a permitted use in the R-3 zone, subject to use-specific standards 4.9.7.B.6.
9. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at elisa.hamblin@tucsonaz.gov or (520) 837-4966.
01/30/2020 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Completed 150 pm - T20PRE0013 - 3250 N STONE AV - LAND SPLIT
The proposed development may connect to the existing 6" water main in Navajo Rd.

Tim Rowe, Sr. Engineering Associate
Tucson Water, New Development Unit
310 W. Alameda St, Tucson, AZ, 85701, (520) 837-2106
01/31/2020 GDAURIA1 COT NON-DSD FIRE Completed * If built under th IBC; all R's require fire sprinklers.