Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T20PI00029
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/03/2021 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approv-Cond | DTM Landscape: 1. Add a note to the plan. a. Contractor shall coordinate with COT Streets and Traffic Maintenance regarding irrigation in the median and shoulders. Contact Matt Sierras 520-400-3995. David Marhefka Landscape Architect City of Tucson Department of Transportation and Mobility (o) 520-837-6618 (m) 520-403-5074 |
02/03/2021 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | DTM Traffic Engineering Comment(s) for consideration: 1. The combination bus pullout/driveway is not preferred. I don't know if any development code prohibits this configuration. 2. Restricting the eastern driveway to right-in/right-out/left-in (no left out) would be preferred. Blake Olofson, P.E. Blake.Olofson@tucsonaz.gov 520-837-6667 |
02/03/2021 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | |
02/11/2021 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Needs Review | |
02/11/2021 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Approved | |
02/11/2021 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | |
02/11/2021 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | |
02/11/2021 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | |
02/11/2021 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | |
02/11/2021 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | |
02/11/2021 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | |
02/11/2021 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | |
02/11/2021 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review | |
02/22/2021 | CRAIG SALTZMAN | DOT ENGINEERING | REVIEW | Reqs Change | 1) All sheets add to title block Plan No. U-2020-017 2) Sht. 1 of 3: Top center of sheet under Title add PIA No. T20PI00029 3) Sht. 1 of 3: Paving Note 20, Remove: “Ernie Encinas at (520) 791-3154” Replace with: Armando Bracamonte at (520) 792-3191 4) Sht. 1 of 3: Add recorded sequence to cover Sheet (plat, grading plan, etc.) This offsite work does not address the work shown for the bus pull out, the following addresses that work and adjustments needed prior to construction of: 1) Remove gutter pan from curb in the City of Tucson along Ajo Way (The City does not use a gutter pan due to the conflicts when milling and overlaying city streets). 2) Remove gutter pan adjacent to bus pull out along Ajo Way. 3) Align pedestrian pathway/ access ramps directly across from each other (remove the skewed path as shown). Also need to extend sidewalk to match new location of westerly access ramp directly across from eastern access ramp. |
02/22/2021 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
02/22/2021 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed |